PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 121136 has been updated at 1245 hrs to the following:
[1.] From 1700 hrs 28/11/2024 to 1830 hrs 28/11/2024.
The forecast capacity reserve requirement is 1776 MW.
The minimum capacity reserve available is 1679 MW.
Manager NEM Real Time Operations
Planned outage of the Red Cliffs - Wemen - Kerang 220kV line in the VIC region on 30/11/2024.
The Red Cliffs - Wemen - Kerang 220kV line in the Victorian (VIC) region is planned to be out of service from 0400 hrs to 1430 hrs on 30/11/2024.
A credible contingency event during this planned outage may require:
- Load shedding in the Victorian outer grid; and/ or
- Market intervention, such as the issuing of directions.
Refer AEMO Network Outage Schedule (NOS) for further details.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 121135 has been updated at 0745 hrs to the following:
[1.] From 1600 hrs 28/11/2024 to 1830 hrs 28/11/2024.
The forecast capacity reserve requirement is 1401 MW.
The minimum capacity reserve available is 1327 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 121104 has been updated at 0645 hrs to the following:
[1.] From 1430 hrs 28/11/2024 to 1830 hrs 28/11/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1242 MW.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 27/11/2024
Cancellation of Actual (LOR1) condition in the NSW region - 27/11/2024
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.121106 is cancelled at 2000 hrs 27/11/2024.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/11/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 121087 is cancelled at 1740 hrs 27/11/2024.
Manager NEM Real Time Operations
End of RERT Dispatch - 27/11/2024 and End of intervention event
End of Reliability and Emergency Reserve Trader (RERT) dispatch for - NSW1 Region - 27/11/2024 and end of AEMO Intervention Event.
Refer AEMO Electricity Market Notices 121102
Activation of reserve contract(s) has ended.
The reserve contract(s) were activated from 15:45 hrs 27/11/2024 to 16:45 hrs 27/11/2024
The AEMO Intervention Event ended from 16:45 hrs 27/11/2024
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - NSW region 27/11/2024
Cancellation - AEMO Intervention Event - NSW region 27/11/2024
Refer to Market Notice 121070
The AEMO Intervention Event and all associated directions are cancelled from 1645 hrs on 27/11/2024.
Manager NEM Real Time Operations
Cancellation: Direction issued to: Munmorah Battery ProjectCo Pty Ltd - WARATAHBESS1
Cancellation: Direction issued to: Munmorah Battery ProjectCo Pty Ltd - WARATAHBESS1
Refer to Market Notice 121083
Direction is cancelled from: 1645 hrs 27/11/2024
Manager NEM Real Time Operations