Filter by category
Filter by Date
[EventId:202501071030_confirmed] Prices for interval 07-Jan-2025 10:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 7 January 2025
PRICES ARE NOW CONFIRMED for trading interval 07-Jan-2025 10:30.
In accordance with Market Notice 122933 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501071025_confirmed] Prices for interval 07-Jan-2025 10:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 7 January 2025
PRICES ARE NOW CONFIRMED for trading interval 07-Jan-2025 10:25.
In accordance with Market Notice 122932 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501071020_confirmed] Prices for interval 07-Jan-2025 10:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 7 January 2025
PRICES ARE NOW CONFIRMED for trading interval 07-Jan-2025 10:20.
In accordance with Market Notice 122930 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501071015_confirmed] Prices for interval 07-Jan-2025 10:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 7 January 2025
PRICES ARE NOW CONFIRMED for trading interval 07-Jan-2025 10:15.
In accordance with Market Notice 122929 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501071005_confirmed] Prices for interval 07-Jan-2025 10:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 7 January 2025
PRICES ARE NOW CONFIRMED for trading interval 07-Jan-2025 10:05.
In accordance with Market Notice 122925 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501071015_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 07 January 2025 10:15
Issued by Australian Energy Market Operator Ltd at 1015 hrs on 7 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1015 hrs on 7 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202501071000_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 07 January 2025 10:00
Issued by Australian Energy Market Operator Ltd at 1000 hrs on 7 January 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 January 2025.
Refer to market notice: 122924
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1000 hrs on 7 January 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202501070835_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 07 January 2025 08:35
Issued by Australian Energy Market Operator Ltd at 0835 hrs on 7 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0835 hrs on 7 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Cancellation of a Non-Credible Contingency Event: Kamerunga to Barron Gorge No.7184 132 kV and the Kamerunga to Barron Gorge No.7143 132 kV lines in QLD due to lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: QLD
Lines: Kamerunga to Barron Gorge No.7184 132 kV and the Kamerunga to Barron Gorge No.7143 132 kV lines
Cancellation time: 07/01/2025 05:30
Constraint set(s) invoked: Nil
Refer AEMO Electricity Market Notice 122918
Manager NEM Real Time Operations