Filter by category
Filter by Date
[EventId:202410191040_confirmed] Prices for interval 19-Oct-2024 10:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1036 hrs on 19 October 2024
PRICES ARE NOW CONFIRMED for trading interval 19-Oct-2024 10:40.
In accordance with Market Notice 119051 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202410191035_confirmed] Prices for interval 19-Oct-2024 10:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1036 hrs on 19 October 2024
PRICES ARE NOW CONFIRMED for trading interval 19-Oct-2024 10:35.
In accordance with Market Notice 119049 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/10/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119019 is cancelled at 1500 hrs 18/10/2024.
Manager NEM Real Time Operations
Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN at 1600 hrs 18/10/2024
Type of resource: generating unit
Required actions: Synchronise and follow dispatch targets at 1100 hrs 19/10/2024
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 20/10/2024.
AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Refer AEMO Electricity Participant Notice 118991
The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 20/10/2024.
The direction update is issued at 1600 hrs 18/10/2024.
Manager NEM Real Time Operations
Update Direction - Synergen Power Pty Limited - MINTARO MINTARO GAS
Update Direction - Synergen Power Pty Limited - MINTARO MINTARO GAS
Refer AEMO Electricity Participant Notice 118990
The MINTARO MINTARO GAS direction is now expected to stay in place until 1100 hrs 19/10/2024.
The direction update is issued at 1600 hrs 18/10/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 19/10/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
From 1800 hrs 19/10/2024 to 1930 hrs 19/10/2024.
The forecast capacity reserve requirement is 1081 MW.
The minimum capacity reserve available is 906 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/10/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1730 hrs 18/10/2024 to 1830 hrs 18/10/2024.
The forecast capacity reserve requirement is 1190 MW.
The minimum capacity reserve available is 1091 MW.
Manager NEM Real Time Operations
[EventId:202410172040_confirmed] Prices for interval 17-Oct-2024 20:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 2100 hrs on 17 October 2024
PRICES ARE NOW CONFIRMED for trading interval 17-Oct-2024 20:40.
In accordance with Market Notice 119002 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.