[EventId:202410031005_confirmed] Prices for interval 03-Oct-2024 10:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 3 October 2024
PRICES ARE NOW CONFIRMED for trading interval 03-Oct-2024 10:05.
In accordance with Market Notice 118572 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202410031000_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 03 October 2024 10:00
Issued by Australian Energy Market Operator Ltd at 1000 hrs on 3 October 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 October 2024.
Refer to market notice: 118570
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1000 hrs on 3 October 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202410030905_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 October 2024 09:05
Issued by Australian Energy Market Operator Ltd at 0905 hrs on 3 October 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 October 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0905 hrs on 3 October 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Cancellation: Reclassification of a Non-Credible Contingency Event: Biloela -Biloela Tee 7110/2 132kV line and Biloela -Biloela Tee 7109/2 132kV line in QLD due to Other Threats.
AEMO considers the occurrence of a non-credible contingency event due to other threats advised in AEMO Electricity Market Notice 118563 is no longer reasonably possible and accordingly its classification has reverted to non-credible.
Cancellation time: 1930 hrs 02/10/2024.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Biloela -Biloela Tee 7110/2 132kV line and Biloela -Biloela Tee 7109/2 132kV line in QLD due to Other Threats.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Other Threats. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: QLD
Lines: Biloela -Biloela Tee 7110/2 132kV line and Biloela -Biloela Tee 7109/2 132kV line
Duration:15:00 hrs 02/10/2024 until further notice
Constraint set(s) invoked: Nil
Manager NEM Real Time Operations
[EventId:202410021230_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 02 October 2024 12:30
Issued by Australian Energy Market Operator Ltd at 1230 hrs on 2 October 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 October 2024.
Refer to market notice: 118557
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1230 hrs on 2 October 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202410021110_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 02 October 2024 11:10
Issued by Australian Energy Market Operator Ltd at 1110 hrs on 2 October 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 October 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1110 hrs on 2 October 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202410021100_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 02 October 2024 11:00
Issued by Australian Energy Market Operator Ltd at 1100 hrs on 2 October 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 October 2024.
Refer to market notice: 118554
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1100 hrs on 2 October 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202410020950_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 02 October 2024 09:50
Issued by Australian Energy Market Operator Ltd at 0950 hrs on 2 October 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 October 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0950 hrs on 2 October 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.