PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 24/09/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:
[1.] From 1900 hrs 24/09/2024 to 1930 hrs 24/09/2024.
The forecast capacity reserve requirement is 593 MW.
The minimum capacity reserve available is 584 MW.
[2.] From 2330 hrs 24/09/2024 to 0000 hrs 25/09/2024.
The forecast capacity reserve requirement is 589 MW.
The minimum capacity reserve available is 583 MW.
Manager NEM Real Time Operations
Minimum System Load 1 (MSL1) in the VIC Region on 28/09/2024
AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the Victorian region from 1100 hrs to 1400 hrs 28/09/2024.
Minimum regional demand is forecast to be 1638 MW at 1300 hrs, and the advisory threshold is:
- MSL1 - 1865 MW
- MSL2 - 1365 MW
- MSL3 - 865 MW
MSL events are forecast when forecast regional demand is less than the relevant MSL threshold. The forecast regional demand is below the MSL1 threshold.
Refer to NEM Data Dashboard to monitor demand levels: https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/data-dashboard-nem
AEMO is seeking a market response.
An insufficient market response may require AEMO to take action or intervene to maintain power system security in Victoria. This may result in actions such as recalling network outages, the direction of scheduled production units, curtailment of non-scheduled production units, and/or a direction to maintain regional demand above required MSL threshold, in both Victoria and South Australia.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 24/09/2024
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118418 is cancelled at 1420 hrs 24/09/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 24/09/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:
From 1930 hrs 24/09/2024 to 2100 hrs 24/09/2024.
The forecast capacity reserve requirement is 527 MW.
The minimum capacity reserve available is 435 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 24/09/2024
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118411 is cancelled at 1115 hrs 24/09/2024.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 24/09/2024
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118399 has been updated at 2220 hrs to the following:
[1.] From 1830 hrs 24/09/2024 to 2200 hrs 24/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 404 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 23/09/2024
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118401 is cancelled at 1550 hrs 23/09/2024.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 23/09/2024
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118396 has been updated at 1315 hrs to the following:
From 1930 hrs 23/09/2024 to 2100 hrs 23/09/2024.
The forecast capacity reserve requirement is 537 MW.
The minimum capacity reserve available is 443 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 24/09/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:
From 1730 hrs 24/09/2024 to 2130 hrs 24/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 382 MW.
Manager NEM Real Time Operations