118703PRICES SUBJECT TO REVIEW09/10/2024 12:35:20 PM

[EventId:202410091240_review] Prices for interval 09-Oct-2024 12:40 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1235 hrs on 9 October 2024

PRICES ARE SUBJECT TO REVIEW for trading interval 09-Oct-2024 12:40.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
118701PRICES SUBJECT TO REVIEW09/10/2024 12:30:24 PM

[EventId:202410091235_review] Prices for interval 09-Oct-2024 12:35 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1230 hrs on 9 October 2024

PRICES ARE SUBJECT TO REVIEW for trading interval 09-Oct-2024 12:35.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
118700MARKET INTERVENTION09/10/2024 12:16:43 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 118696

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2100 hrs 09/10/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1400 hrs 09/10/2024, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
118698RESERVE NOTICE09/10/2024 10:52:16 AM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region [beginning] on 09/10/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 118694 is cancelled at 1050 hrs 09/10/2024.

Manager NEM Real Time Operations
118696MARKET INTERVENTION09/10/2024 09:55:43 AM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2100 hrs 09/10/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
118694RESERVE NOTICE09/10/2024 08:50:05 AM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 09/10/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:

[1.] From 1800 hrs 09/10/2024 to 1830 hrs 09/10/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1393 MW.

Manager NEM Real Time Operations
118692RECLASSIFY CONTINGENCY09/10/2024 06:48:56 AM

Reclassification of a Non-Credible Contingency Event: Armidale - Dumaresq 8C 330kV line and Armidale - Sapphire WF 8E 330kV line in NSW1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: NSW1

Lines: Armidale - Dumaresq 8C 330kV and Armidale - Sapphire WF 8E 330kV

Duration: 09/10/2024 06:48 until further notice

Constraint set(s) invoked:
N-ARDM_ARSR_1PH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1


Auto-generated on behalf of Manager NEM Real Time Operations
118691RESERVE NOTICE08/10/2024 04:37:04 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 09/10/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 118671 is cancelled at 1630 hrs 08/10/2024.

Manager NEM Real Time Operations
118684PRICES SUBJECT TO REVIEW08/10/2024 04:05:21 PM

[EventId:202410081610_review] Prices for interval 08-Oct-2024 16:10 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1605 hrs on 8 October 2024

PRICES ARE SUBJECT TO REVIEW for trading interval 08-Oct-2024 16:10.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.