118435RESERVE NOTICE25/09/2024 02:42:31 AM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 25/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118432 has been updated at 0230 hrs to the following:

[1.] From 0700 hrs 25/09/2024 to 0730 hrs 25/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 592 MW.

Manager NEM Real Time Operations
118434RESERVE NOTICE25/09/2024 01:24:21 AM

Cancellation of Actual (LOR1) condition in the SA region - 24/09/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the SA region - 24/09/2024

The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.118433 is cancelled at 0120 hrs 25/09/2024.

Manager NEM Real Time Operations
118433RESERVE NOTICE24/09/2024 11:13:14 PM

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 24/09/2024

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 24/09/2024

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 2300 hrs.
The Actual LOR1 condition is forecast to exist until 0200 hrs

The capacity reserve requirement is 600 MW
The minimum capacity reserve available is 520 MW

Manager NEM Real Time Operations
118432RESERVE NOTICE24/09/2024 09:23:54 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 25/09/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:

[1.] From 0000 hrs 25/09/2024 to 0100 hrs 25/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 580 MW.

[2.] From 0700 hrs 25/09/2024 to 0730 hrs 25/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 547 MW.

Manager NEM Real Time Operations
118431RESERVE NOTICE24/09/2024 07:56:32 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 25/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118429 is cancelled at 2000 hrs 24/09/2024.

Manager NEM Real Time Operations
118430RESERVE NOTICE24/09/2024 05:46:51 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 24/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118428 is cancelled at 1745 hrs 24/09/2024.

Manager NEM Real Time Operations
118429RESERVE NOTICE24/09/2024 04:56:46 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 25/09/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:

From 0000 hrs 25/09/2024 to 0100 hrs 25/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 571 MW.



Manager NEM Real Time Operations
118428RESERVE NOTICE24/09/2024 04:55:42 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 24/09/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:

[1.] From 1900 hrs 24/09/2024 to 1930 hrs 24/09/2024.
The forecast capacity reserve requirement is 593 MW.
The minimum capacity reserve available is 584 MW.

[2.] From 2330 hrs 24/09/2024 to 0000 hrs 25/09/2024.
The forecast capacity reserve requirement is 589 MW.
The minimum capacity reserve available is 583 MW.


Manager NEM Real Time Operations
118421MINIMUM SYSTEM LOAD24/09/2024 02:54:54 PM

Minimum System Load 1 (MSL1) in the VIC Region on 28/09/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the Victorian region from 1100 hrs to 1400 hrs 28/09/2024.
Minimum regional demand is forecast to be 1638 MW at 1300 hrs, and the advisory threshold is:
- MSL1 - 1865 MW
- MSL2 - 1365 MW
- MSL3 - 865 MW

MSL events are forecast when forecast regional demand is less than the relevant MSL threshold. The forecast regional demand is below the MSL1 threshold.

Refer to NEM Data Dashboard to monitor demand levels: https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/data-dashboard-nem

AEMO is seeking a market response.

An insufficient market response may require AEMO to take action or intervene to maintain power system security in Victoria. This may result in actions such as recalling network outages, the direction of scheduled production units, curtailment of non-scheduled production units, and/or a direction to maintain regional demand above required MSL threshold, in both Victoria and South Australia.

AEMO Operations