Filter by category
Filter by Date
[EventId:202501021010_confirmed] Prices for interval 02-Jan-2025 10:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 2 January 2025
PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 10:10.
In accordance with Market Notice 122702 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501021030_confirmed] Prices for interval 02-Jan-2025 10:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 2 January 2025
PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 10:30.
In accordance with Market Notice 122707 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501021025_confirmed] Prices for interval 02-Jan-2025 10:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 2 January 2025
PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 10:25.
In accordance with Market Notice 122706 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501021015_confirmed] Prices for interval 02-Jan-2025 10:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 2 January 2025
PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 10:15.
In accordance with Market Notice 122703 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501021005_confirmed] Prices for interval 02-Jan-2025 10:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1030 hrs on 2 January 2025
PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 10:05.
In accordance with Market Notice 122700 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501021000_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 02 January 2025 10:00
Issued by Australian Energy Market Operator Ltd at 1000 hrs on 2 January 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 January 2025.
Refer to market notice: 122698
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1000 hrs on 2 January 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202501020800_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 02 January 2025 08:00
Issued by Australian Energy Market Operator Ltd at 0800 hrs on 2 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0800 hrs on 2 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 06/01/2025
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 122695 has been updated at 0645 hrs 02/01/2025 to the following:
From 1500 hrs 06/01/2025 to 1830 hrs 06/01/2025.
The forecast capacity reserve requirement is 700 MW.
The minimum capacity reserve available is 103 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 06/01/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period[s]:
[1.] From 1600 hrs 06/01/2025 to 1700 hrs 06/01/2025.
The forecast capacity reserve requirement is 700 MW.
The minimum capacity reserve available is 509 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations