Filter by category
Filter by Date
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 06/02/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 124157 has been updated to the following:
[1.] From 1730 hrs 06/02/2025 to 1900 hrs 06/02/2025.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1182 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 07/02/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 124093 has been updated at 1500 hrs 05/02/2025 to the following:
1. From 1600 hrs to 1630 hrs 07/02/2025.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1119 MW.
2. From 1900 hrs to 1930 hrs 07/02/2025.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1306 MW.
AEMO Operations
Update - Vulnerable lines in TAS region
Update - Lightning vulnerable lines in TAS region
Refer to AEMO Electricity Market Notice 124044
At 1410 hrs 03/02/2025 the Farrell - Reece No.1 and No.2 220 kV lines lines tripped.
The cause of the trip was identified as due to lightning.
In accordance with SO_OP_3715, AEMO now considers the Farrell - Reece No.1 and No.2 220 kV lines to be vulnerable with a category of probable due to lightning.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 05/02/2025
Cancellation of Actual (LOR1) condition in the NSW region - 05/02/2025
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.124176 is cancelled at 1444 hrs 05/02/2025.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 05/02/2025
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 05/02/2025
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1330 hrs.
The Actual LOR1 condition is forecast to exist until 1430 hrs
The capacity reserve requirement is 1320 MW
The minimum capacity reserve available is 1254 MW
Manager NEM Real Time Operations
[EventId:202502051300_confirmed] Prices for interval 05-Feb-2025 13:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1320 hrs on 5 February 2025
PRICES ARE NOW CONFIRMED for trading interval 05-Feb-2025 13:00.
In accordance with Market Notice 124159 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502051320_confirmed] Prices for interval 05-Feb-2025 13:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1320 hrs on 5 February 2025
PRICES ARE NOW CONFIRMED for trading interval 05-Feb-2025 13:20.
In accordance with Market Notice 124167 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502051315_confirmed] Prices for interval 05-Feb-2025 13:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1320 hrs on 5 February 2025
PRICES ARE NOW CONFIRMED for trading interval 05-Feb-2025 13:15.
In accordance with Market Notice 124163 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502051310_confirmed] Prices for interval 05-Feb-2025 13:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1320 hrs on 5 February 2025
PRICES ARE NOW CONFIRMED for trading interval 05-Feb-2025 13:10.
In accordance with Market Notice 124162 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.