[EventId:202501271330_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 27 January 2025 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 27 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 27 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1330 hrs on 27 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/01/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1430 hrs 28/01/2025 to 1630 hrs 28/01/2025.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1064 MW.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 28/01/2025
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 123750 is cancelled at 1120 hrs 27/01/2025.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 28/01/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1500 hrs 28/01/2025 to 1600 hrs 28/01/2025.
The forecast capacity reserve requirement is 1005 MW.
The minimum capacity reserve available is 972 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/01/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1500 hrs 28/01/2025 to 1530 hrs 28/01/2025.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1327 MW.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/01/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 123675 is cancelled at 1420 hrs 25/01/2025.
No LOR condition is currently forecast in the STPASA period.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/01/2025
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 123693 is cancelled at 1910 hrs 24/01/2025.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/01/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 24/01/2025 to 1900 hrs 24/01/2025.
The forecast capacity reserve requirement is 854 MW.
The minimum capacity reserve available is 816 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/01/2025
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 123671 is cancelled at 1645 hrs 24/01/2025.
Manager NEM Real Time Operations