PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/01/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 13/01/2025 to 1830 hrs 13/01/2025.
The forecast capacity reserve requirement is 1815 MW.
The minimum capacity reserve available is 1796 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 15/01/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1730 hrs 15/01/2025 to 1930 hrs 15/01/2025.
The forecast capacity reserve requirement is 1859 MW.
The minimum capacity reserve available is 1580 MW.
Manager NEM Real Time Operations
[EventId:202501111230_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 11 January 2025 12:30
Issued by Australian Energy Market Operator Ltd at 1230 hrs on 11 January 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 11 January 2025.
Refer to market notice: 123028
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1230 hrs on 11 January 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202501110905_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 11 January 2025 09:05
Issued by Australian Energy Market Operator Ltd at 0905 hrs on 11 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 11 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0905 hrs on 11 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202501081330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 08 January 2025 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 8 January 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 January 2025.
Refer to market notice: 122960
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 8 January 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202501081200_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 08 January 2025 12:00
Issued by Australian Energy Market Operator Ltd at 1200 hrs on 8 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1200 hrs on 8 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202501081100_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 08 January 2025 11:00
Issued by Australian Energy Market Operator Ltd at 1100 hrs on 8 January 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 January 2025.
Refer to market notice: 122958
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1100 hrs on 8 January 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202501080800_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 08 January 2025 08:00
Issued by Australian Energy Market Operator Ltd at 0800 hrs on 8 January 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 8 January 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0800 hrs on 8 January 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202501071400_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 07 January 2025 14:00
Issued by Australian Energy Market Operator Ltd at 1400 hrs on 7 January 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 January 2025.
Refer to market notice: 122942
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1400 hrs on 7 January 2025.
This is an AEMO autogenerated Market Notice.