Market Notices

122755MARKET INTERVENTION02/01/2025 04:32:44 PM

Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 122451


In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Pelican Point Power Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT at 1630 hrs 02/01/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0700 hrs 03/01/2025
Services provided: Voltage Control
Circumstances necessitating the Direction:Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1530 hrs 03/01/2025 / further notice.

Pelican Point Power Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
122754MARKET INTERVENTION03/01/2025 03:33:17 AM

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 122666

Direction is cancelled from: 0400 hrs 03/01/2025

Manager NEM Real Time Operations
     
122753MARKET INTERVENTION02/01/2025 04:30:31 PM

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 122665

The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 1330 hrs 03/01/2025.

The direction update is issued at 1630 hrs 02/01/2025.

Manager NEM Real Time Operations
     
122734RESERVE NOTICE02/01/2025 03:00:28 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 06/01/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 122633 has been updated at 1400 hrs 02/01/2025 to the following:

1. From 1400 hrs to 1530 hrs 06/01/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 700 MW.

2. From 1830 hrs to 2230 hrs 06/01/2025.
The forecast capacity reserve requirement is 1845 MW.
The minimum capacity reserve available is 1137 MW.

AEMO Operations
     
122699RECALL GEN CAPACITY02/01/2025 08:36:19 AM

Request for Generator Recall Information for the period 06/01/2025 for Region NSW

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice no. 122697.

Please provide Generator Recall Information for the period 06/01/2025, by 1200 hrs on 03/01/2025 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf


AEMO Operations
     
122666MARKET INTERVENTION01/01/2025 03:56:53 PM

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 122631


The PPCCGT PELICAN POINT direction is now expected to stay in place until 0400 hrs 03/01/2025.

The direction update is issued at 1600 hrs 01/01/2025.

Manager NEM Real Time Operations
     
122665MARKET INTERVENTION01/01/2025 03:55:31 PM

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer to Market Notice 122630

The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 03/01/2025.

The direction update is issued at 1600 hrs 01/01/2025.

Manager NEM Real Time Operations
     
122663MINIMUM SYSTEM LOAD01/01/2025 02:06:40 PM

Cancellation of Actual Minimum System Load (MSL) MSL1 event in the VIC Region on 01/01/2025.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual Minimum System Load (MSL) MSL1 event in the VIC Region on 01/01/2025.

Cancellation - Actual MSL1- VIC Region at 1400 hrs 01/01/2025.

Refer to Market Notice 122654 for MSL1.

Manager NEM Real Time Operations
     
122654MINIMUM SYSTEM LOAD01/01/2025 11:56:13 AM

Actual Minimum System Load MSL1 condition in the VIC Region on 01/01/2025

AEMO ELECTRICITY MARKET NOTICE
Actual Minimum System Load MSL1 condition in the VIC Region on 01/01/2025

Update to Market Notice 122653 - AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC on 01/01/2025.

Minimum regional demand is forecast to be 1398 MW at 1300 hrs, and the advisory threshold is:
- MSL1 - 1535 MW
- MSL2 - 1035 MW
- MSL3 - 535 MW

The regional demand is below the MSL1 threshold. The actual MSL1 condition is forecast to exist until 1400 hrs.

Manager NEM Real Time Operations
     