Market Notices

126400MARKET INTERVENTION06/04/2025 06:31:17 PM

Cancellation - AEMO Intervention Event - SA region 05/04/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 05/04/2025

Refer to Market Notice 126347

The AEMO Intervention Event and all associated directions are cancelled from 1830 hrs on 06/04/2025.


Manager NEM Real Time Operations
     
126399MARKET INTERVENTION06/04/2025 06:29:01 PM

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 126377

Direction is cancelled from: 1830 hrs 06/04/2025

Manager NEM Real Time Operations
     
126390SETTLEMENTS RESIDUE06/04/2025 05:50:25 PM

[EventId:202504061750_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 06 April 2025 17:50

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1750 hrs on 6 April 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 6 April 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1750 hrs on 6 April 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
126385MARKET INTERVENTION06/04/2025 04:58:10 PM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer to Market Notice 126348

Direction is cancelled from: 1700 hrs 06/04/2025

Manager NEM Real Time Operations
     
126384MARKET INTERVENTION06/04/2025 02:35:35 PM

Direction - SA region 06/04/2025

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 06/04/2025

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1440 hrs on 06/04/2025.

Intervention pricing does not apply to this AEMO intervention event.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.


Manager NEM Real Time Operations
     
126383MARKET INTERVENTION06/04/2025 02:36:05 PM

Direction - SA region to AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region to AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

Refer to Market Notice 126384.


In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN at 1435 hrs 06/04/2025
Type of resource: generating unit
Required actions: Synchronise and follow dispatch targets at 0930 hrs 07/04/2025
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 1330 hrs 07/04/2025.

AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
126382MARKET INTERVENTION06/04/2025 02:27:43 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 126378

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0930 hrs 07/04/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1435 hrs 06/04/2025, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
126380NON-CONFORMANCE06/04/2025 12:55:19 PM

NON-CONFORMANCE Region SA1 Sunday, 6 April 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE SA1 Region Sunday, 6 April 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: HPR1
Duration: 06/04/2025 12:40 to 06/04/2025 12:55
Amount: 16 MW
Constraint: NC-S_HPR1

Auto-generated on behalf of Manager NEM Real Time Operations
     
126378MARKET INTERVENTION06/04/2025 12:51:28 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0830 hrs 07/04/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     