125168RESERVE NOTICE01/03/2025 06:43:38 PM

Cancellation of Actual (LOR1) condition in the NSW region - 01/03/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 01/03/2025

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.125159 is cancelled at 1842 hrs 01/03/2025.

Manager NEM Real Time Operations
     
125159RESERVE NOTICE01/03/2025 05:43:58 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 01/03/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 01/03/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1830 hrs

The capacity reserve requirement is 1400 MW
The minimum capacity reserve available is 1354 MW

Manager NEM Real Time Operations
     
125138INTER-REGIONAL TRANSFER01/03/2025 02:46:35 PM

Inter-regional transfer limit variation - constraint automation to manage Power System Security in NSW region - 01/03/2025

AEMO ELECTRICITY MARKET NOTICE

In order to maintain the power system in a secure operating state in the NSW region, AEMO has invoked automated constraint set CA_BRIS_56D513DF from 1430 hrs until further notice.

This constraint set contains equations with the following interconnector on the LHS;

VIC1-NSW1

Manager NEM Real Time Operations
     
125134SETTLEMENTS RESIDUE28/02/2025 07:15:20 PM

[EventId:202502281915_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 28 February 2025 19:15

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1915 hrs on 28 February 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 February 2025.

Refer to market notice: 125133

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1915 hrs on 28 February 2025.

This is an AEMO autogenerated Market Notice.
     
125133SETTLEMENTS RESIDUE28/02/2025 06:30:20 PM

[EventId:202502281830_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 28 February 2025 18:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1830 hrs on 28 February 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 February 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1830 hrs on 28 February 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
125127NON-CONFORMANCE27/02/2025 09:35:13 PM

NON-CONFORMANCE Region QLD1 Thursday, 27 February 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Thursday, 27 February 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: TARONG#1
Duration: 27/02/2025 21:25 to 27/02/2025 21:35
Amount: -11 MW
Constraint: NC-Q_TARONG#1

Auto-generated on behalf of Manager NEM Real Time Operations
     
125123NON-CONFORMANCE27/02/2025 06:50:18 PM

NON-CONFORMANCE Region QLD1 Thursday, 27 February 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Thursday, 27 February 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: WDBESS1
Duration: 27/02/2025 18:35 to 27/02/2025 18:50
Amount: -55 MW
Constraint: NC-Q_WDBESS1

Auto-generated on behalf of Manager NEM Real Time Operations
     
125112NON-CONFORMANCE27/02/2025 08:55:25 AM

NON-CONFORMANCE Region NSW1 Thursday, 27 February 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Thursday, 27 February 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: WTAHB1
Duration: 27/02/2025 08:45 to 27/02/2025 08:55
Amount: -7 MW
Constraint: NC-N_WTAHB1

Auto-generated on behalf of Manager NEM Real Time Operations
     
125105SETTLEMENTS RESIDUE26/02/2025 05:30:24 PM

[EventId:202502261730_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 26 February 2025 17:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1730 hrs on 26 February 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 26 February 2025.

Refer to market notice: 125102

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 1730 hrs on 26 February 2025.