Inter-Regional Transfer limit variation - Directlink - NSW Region
Refer to Market Notice 125355.
Inter-Regional Transfer limit variation - Directlink - NSW Region
There has been an unplanned outage of the No 1 and 2 cables of Directlink .
The following constraint set was invoked at 0620 hrs 07/03/2025
N-X_MBTE_3
The constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
Refer AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
[EventId:202503061315_confirmed] Prices for interval 06-Mar-2025 13:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1335 hrs on 6 March 2025
PRICES ARE NOW CONFIRMED for trading interval 06-Mar-2025 13:15.
In accordance with Market Notice 125314 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503061335_confirmed] Prices for interval 06-Mar-2025 13:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1335 hrs on 6 March 2025
PRICES ARE NOW CONFIRMED for trading interval 06-Mar-2025 13:35.
In accordance with Market Notice 125319 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503061330_confirmed] Prices for interval 06-Mar-2025 13:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1335 hrs on 6 March 2025
PRICES ARE NOW CONFIRMED for trading interval 06-Mar-2025 13:30.
In accordance with Market Notice 125318 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503061325_confirmed] Prices for interval 06-Mar-2025 13:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1335 hrs on 6 March 2025
PRICES ARE NOW CONFIRMED for trading interval 06-Mar-2025 13:25.
In accordance with Market Notice 125317 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503061320_confirmed] Prices for interval 06-Mar-2025 13:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1335 hrs on 6 March 2025
PRICES ARE NOW CONFIRMED for trading interval 06-Mar-2025 13:20.
In accordance with Market Notice 125316 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503061310_confirmed] Prices for interval 06-Mar-2025 13:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1335 hrs on 6 March 2025
PRICES ARE NOW CONFIRMED for trading interval 06-Mar-2025 13:10.
In accordance with Market Notice 125313 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Inter-Regional Transfer limit variation - Directlink - NSW Region
Inter-Regional Transfer limit variation - Directlink - NSW Region
There has been an unplanned outage of the No. 1 and 2 Legs of Directlink.
The following constraint set was invoked at 1125 hrs 06/03/2025.
N-X_MBTE_3
The constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
Refer AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
NEM Local Temperature Alerts for SA from 06 Mar 2025 to 10 Mar 2025
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
SA
Port Augusta Ap (39+ Deg C): 10th Mar
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning