127006RESERVE NOTICE12/05/2025 05:12:44 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 15/05/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 127003 has been updated at 1600 hrs 12/05/2025 to the following:

1. From 1130 hrs to 1200 hrs 15/05/2025.
The forecast capacity reserve requirement is 459 MW.
The minimum capacity reserve available is 457 MW.

2. From 1430 hrs to 1530 hrs 15/05/2025.
The forecast capacity reserve requirement is 467 MW.
The minimum capacity reserve available is 456 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
127003RESERVE NOTICE12/05/2025 04:00:44 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 15/05/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 126998 has been updated at 1500 hrs 12/05/2025 to the following:

From 1430 hrs to 1500 hrs 15/05/2025.
The forecast capacity reserve requirement is 461 MW.
The minimum capacity reserve available is 453 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
126998RESERVE NOTICE12/05/2025 02:03:00 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 15/05/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

From 1030 hrs to 1230 hrs 15/05/2025.
The forecast capacity reserve requirement is 438 MW.
The minimum capacity reserve available is 401 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
126941SETTLEMENTS RESIDUE07/05/2025 07:30:31 PM

[EventId:202505071930_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 07 May 2025 19:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1930 hrs on 7 May 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 May 2025.

Refer to market notice: 126940

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1930 hrs on 7 May 2025.

This is an AEMO autogenerated Market Notice.
     
126940SETTLEMENTS RESIDUE07/05/2025 05:35:32 PM

[EventId:202505071735_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 07 May 2025 17:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1735 hrs on 7 May 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 May 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1735 hrs on 7 May 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
126930INTER-REGIONAL TRANSFER07/05/2025 02:33:00 PM

Inter-regional transfer limit variation - Newcastle - Eraring (90) 330 kV line - NSW region - 07/05/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Newcastle - Eraring (90) 330 kV line - NSW region - 07/05/2025

A planned outage of Newcastle - Eraring (90) 330 kV line in the NSW region was scheduled from 0700 hrs 07/05/2025 to 1700 hrs 10/05/2025.

The outage has been completed and Newcastle - Eraring (90) 330 kV line returned to service at 1335 hrs 07/05/2025

Constraint set(s) revoked: N-ERNC_90

Manager NEM Real Time Operations
     
126909SETTLEMENTS RESIDUE06/05/2025 05:00:30 PM

[EventId:202505061700_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 06 May 2025 17:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1700 hrs on 6 May 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 6 May 2025.

Refer to market notice: 126908

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 1700 hrs on 6 May 2025.

This is an AEMO autogenerated Market Notice.
     
126908SETTLEMENTS RESIDUE06/05/2025 04:20:26 PM

[EventId:202505061620_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 06 May 2025 16:20

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1620 hrs on 6 May 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 6 May 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1620 hrs on 6 May 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
126903INTER-REGIONAL TRANSFER06/05/2025 12:59:40 PM

Inter-regional transfer limit variation - South East - Tailem Bend No. 2 275 kV Line - SA region - 06/05/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - South East - Tailem Bend No. 2 275 kV Line - SA region - 06/05/2025

At 1300 hrs 06/05/2025 there was a short notice outage of South East - Tailem Bend No. 2 275 kV Line .

The following constraint set(s) invoked at 1300 hrs 06/05/2025
S-TBSE

This constraint set(s) contains equations with the following interconnectors on the LHS.
V-SA,NSW1-QLD1,T-V-MNSP1,V-S-MNSP1,VIC1-NSW1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     