Filter by category
Filter by Date
[EventId:202502181505_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 18 February 2025 15:05
Issued by Australian Energy Market Operator Ltd at 1505 hrs on 18 February 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 18 February 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1505 hrs on 18 February 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 124769
Required actions update: Remain synchronised and follow dispatch targets at 0800 hrs 18/02/2025
The direction update is issued at 0720 hrs 18/02/2025.
Manager NEM Real Time Operations
[EventId:202502171630_review] Prices for interval 17-Feb-2025 16:30 are subject to review
Issued by Australian Energy Market Operator Ltd at 1625 hrs on 17 February 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 17-Feb-2025 16:30.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202502171625_review] Prices for interval 17-Feb-2025 16:25 are subject to review
Issued by Australian Energy Market Operator Ltd at 1620 hrs on 17 February 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 17-Feb-2025 16:25.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202502171620_review] Prices for interval 17-Feb-2025 16:20 are subject to review
Issued by Australian Energy Market Operator Ltd at 1615 hrs on 17 February 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 17-Feb-2025 16:20.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202502171615_review] Prices for interval 17-Feb-2025 16:15 are subject to review
Issued by Australian Energy Market Operator Ltd at 1610 hrs on 17 February 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 17-Feb-2025 16:15.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202502171610_review] Prices for interval 17-Feb-2025 16:10 are subject to review
Issued by Australian Energy Market Operator Ltd at 1605 hrs on 17 February 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 17-Feb-2025 16:10.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202502171605_review] Prices for interval 17-Feb-2025 16:05 are subject to review
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 17 February 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 17-Feb-2025 16:05.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 124618
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Pelican Point Power Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT at 1600 hrs 17/02/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0730 hrs 18/02/2025
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 19/02/2025.
Pelican Point Power Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations