Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 122451
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Pelican Point Power Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT at 1630 hrs 02/01/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0700 hrs 03/01/2025
Services provided: Voltage Control
Circumstances necessitating the Direction:Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1530 hrs 03/01/2025 / further notice.
Pelican Point Power Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 122665
The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 1330 hrs 03/01/2025.
The direction update is issued at 1630 hrs 02/01/2025.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Guybal Munjan - Chalumbin 857 275kV line line and Guybal Munjan - Chalumbin 858 275kV line line in QLD1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: QLD1
Lines: Guybal Munjan - Chalumbin 857 275kV line and Guybal Munjan - Chalumbin 858 275kV line
Duration: 02/01/2025 16:00 until further notice
Constraint set(s) invoked:
Q-RSCH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Ross - Tully South - Woree No.8905 275 kV line line and Cardwell - Tully No.7389 132kV line line in QLD1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: QLD1
Lines: Ross - Tully South - Woree No.8905 275 kV line and Cardwell - Tully No.7389 132kV line
Duration: 02/01/2025 16:00 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202501021540_confirmed] Prices for interval 02-Jan-2025 15:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 2 January 2025
PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 15:40.
In accordance with Market Notice 122740 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501021600_confirmed] Prices for interval 02-Jan-2025 16:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 2 January 2025
PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 16:00.
In accordance with Market Notice 122744 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501021555_confirmed] Prices for interval 02-Jan-2025 15:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 2 January 2025
PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 15:55.
In accordance with Market Notice 122743 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501021550_confirmed] Prices for interval 02-Jan-2025 15:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 2 January 2025
PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 15:50.
In accordance with Market Notice 122742 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501021545_confirmed] Prices for interval 02-Jan-2025 15:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 2 January 2025
PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 15:45.
In accordance with Market Notice 122741 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.