The publication of this Final Report and Determination (Final Report) concludes the Rules consultation process conducted by AEMO on various NEM metering procedures to implement recommended process improvements from proponents and AEMO and update the procedures to align with changed rule references under the National Electricity Rules (NER).
This consultation has been conducted as per the Rules consultation requirements detailed in clause 8.9 of the Rules.
Any queries should be directed to AEMO's NEM Retail Procedures Consultation email address, NEM.Retailprocedureconsultations@aemo.com.au.
Final Stage Consultation Documents
- Metering ICF Package Final Report (647 KB, pdf)
- MSATS Procedures: CATS v4.8 Final Determination Change Marked (3.3 MB, pdf)
- MSATS Procedures: CATS v4.8 Final Determination Clean (3.29 MB, pdf)
- MSATS Procedures: WIGS v4.8 Final Determination Change Marked (1.87 MB, pdf)
- MSATS Procedures: WIGS v4.8 Final Determination Clean (1.83 MB, pdf)
- Metrology Procedure: Part A v6.05 Final Determination Change Marked (472 KB, pdf)
- Metrology Procedure: Part A v6.05 Final Determination Clean (465 KB, pdf)
- Metrology Procedure: Part B v6.1 Final Determination Change Marked (828 KB, pdf)
- Metrology Procedure: Part B v6.1 Final Determination Clean (824 KB, pdf)
- Service Level Procedure Metering Data Provider Services v1.8 Final Determination Change Marked (616 KB, pdf)
- Service Level Procedure Metering Data Provider Services v1.8 Final Determination Clean (634 KB, pdf)
- Service Level Procedure Metering Provider Services v1.4 Final Determination Change Marked (365 KB, pdf)
- Service Level Procedure Metering Provider Services v1.4 Final Determination Clean (341 KB, pdf)
- Service Level Procedure Embedded Network Manager v1.1 Final Determination Change Marked (321 KB, pdf)
- Service Level Procedure Embedded Network Manager v1.1 Final Determination Clean (337 KB, pdf)
- Exemption Procedure Meter Installation Malfunctions v1.1 Final Determination Change Marked (331 KB, pdf)
- Exemption Procedure Meter Installation Malfunctions v1.1 Final Determination Clean (328 KB, pdf)
Second Stage Consultation Documents
Submissions closed at 5:00pm (Melbourne time) on 6 August 2019.
- Metering ICF Package Draft Report (951 KB, pdf)
- MSATS Procedures: CATS v4.8 Draft Determination Change Marked (3.1 MB, pdf)
- MSATS Procedures: CATS v4.8 Draft Determination Clean (3.1 MB, pdf)
- MSATS Procedures: WIGS v4.8 Draft Determination Change Marked (1.7 MB, pdf)
- MSATS Procedures: WIGS v4.8 Draft Determination Clean (1.7 MB, pdf)
- Metrology Procedure: Part A v6.05 Draft Determination Change Marked (442 KB, pdf)
- Metrology Procedure: Part A v6.05 Draft Determination Clean (439 KB, pdf)
- Metrology Procedure: Part B v6.1 Draft Determination Change Marked (784 KB, pdf)
- Metrology Procedure: Part B v6.1 Draft Determination Clean (781 KB, pdf)
- Service Level Procedure Meter Data Provider Services v1.8 Draft Determination Change Marked (568 KB, pdf)
- Service Level Procedure Meter Data Provider Services v1.8 Draft Determination Clean (563 KB, pdf)
- Service Level Procedure Meter Provider Services v1.4 Draft Determination Change Marked (329 KB, pdf)
- Service Level Procedure Meter Provider Services v1.4 Draft Determination Clean (327 KB, pdf)
- Service Level Procedure Embedded Network Manager v1.1 Draft Determination Change Marked (309 KB, pdf)
- Service Level Procedure Embedded Network Manager v1.1 Draft Determination Clean (304 KB, pdf)
- Exemption Procedure Meter Installation Malfunctions v1.1 Draft Determination Change Marked (322 KB, pdf)
- Exemption Procedure Meter Installation Malfunctions v1.1 Draft Determination Clean (321 KB, pdf)
- Participant Response Template – Second Stage (111 KB, docx)
Second Stage Submissions
- Tango Energy (660 KB, pdf)
- intelliHUB (244 KB, pdf)
- CitiPower Powercor (111 KB, pdf)
- United Energy (114 KB, pdf)
- Origin Energy (226 KB, pdf)
- Ausgrid (92.6 KB, pdf)
- Endeavour Energy (22.8 KB, pdf)
- Vector AMS (339 KB, pdf)
- PLUS ES (263 KB, pdf)
- Red Lumo (150 KB, pdf)
- SA Power Networks (265 KB, pdf)
- TasNetworks (481 KB, pdf)
First Stage Consultation Documents
- Notice of First Stage Consultation (274 KB, pdf)
- Metering ICF Package Issues Paper (934 KB, pdf)
- MSATS Procedures: CATS Initial Consultation Change Marked (2.2 MB, pdf)
- MSATS Procedures: CATS Initial Consultation Clean (2.2 MB, pdf)
- MSATS Procedures: WIGS Initial Consultation Change Marked (1.4 MB, pdf)
- MSATS Procedures: WIGS Initial Consultation Clean (1.3 MB, pdf)
- Metrology Procedure: Part A Initial Consultation Change Marked (928 KB, pdf)
- Metrology Procedure: Part A Initial Consultation Clean (923 KB, pdf)
- Metrology Procedure: Part B Initial Consultation Change Marked (1.2 MB, pdf)
- Metrology Procedure: Part B Initial Consultation Clean (1.2 MB, pdf)
- Service Level Procedure Meter Data Provider Services Initial Consultation Change Marked (947 KB, pdf)
- Service Level Procedure Meter Data Provider Services Initial Consultation Clean (945 KB, pdf)
- Service Level Procedure Meter Provider Services Initial Consultation Change Marked (660 KB, pdf)
- Service Level Procedure Meter Provider Services Initial Consultation Clean (658 KB, pdf)
- Service Level Procedure Embedded Network Manager Initial Consultation Change Marked (642 KB, pdf)
- Service Level Procedure Embedded Network Manager Initial Consultation Clean (638 KB, pdf)
- Exemption Procedure Meter Installation Malfunctions Initial Consultation Change Marked (635 KB, pdf)
- Exemption Procedure Meter Installation Malfunctions Initial Consultation Clean (633 KB, pdf)
- Participant Response Template – First (110 KB, docx)
First Stage Submissions
- AGL (311 KB, pdf)
- Origin (297 KB, pdf)
- Red/Lumo (208 KB, pdf)
- Tango (488 KB, pdf)
- AusNet (214 KB, pdf)
- Energy Queensland (137 KB, pdf)
- EVO Energy (747 KB, pdf)
- intelliHUB (250 KB, pdf)
- Vector (971 KB, pdf)
- Ausgrid (254 KB, pdf)
- Momentum (1.2 MB, pdf)
- Endeavour (26 KB, pdf)
- PLUS ES (898 KB, pdf)
- TasNetworks (493 KB, pdf)
- SA Power Networks (583 KB, pdf)