As required by National Electricity Rule (NER) 3.15.6AA(f), AEMO is consulting on the proposal for non-material changes to the Frequency Contribution Factors Procedure (FCFP) in accordance with the expedited rules consultation procedure in NER 8.9.3.
As explained in the Draft Report, AEMO is proposing four non-material changes to the FCFP, being:
- The addition of detail about how AEMO determines the total amount of generation in a National Electricity Market region
- Correcting an error in the formulas for used raise and used lower regulation frequency control ancillary services
- Adding a clarification to the formulas for calculating the raise and lower requirements for corrective response
- Adopting a change being made to the NER in relation to the allocation of non-energy cost recovery amounts.
Expedited consultation process
AEMO considers that the expedited rules consultation procedure is appropriate for the proposal because it is not expected to have a significant impact on:
- The NEM wholesale market or power system, because the proposal corrects errors and provides additional explanation without changing any methodologies or requirements (in the third instance).
- The activities of the groups of registered participants that the proposal relates to, because the proposal is consistent with the intended operation of the frequency performance payment (FPP) arrangements scheduled to take effect on 8 June 2025.
- At any time before the final report is published, and based on information received through submissions to this draft report, any procedure change requests under NER 8.9.3(b) or otherwise, AEMO may decide that the proposal can no longer be considered non-material. If so, AEMO will switch to the standard consultation procedure by publishing a notice under NER 8.9.3(f).
Consultation documents
Consultation timeline
Consultation steps |
Dates |
Draft report published |
21 Feb 2025 |
Procedure change request deadline |
7 March 2025 |
Final report published |
1 April 2025 |
Further information
If you have any questions related to this change, please email NEMreform@aemo.com.au.