Notice of Second Stage of Consultation
Date of Notice: 25 July 2017
This notice informs all Registered Participants and interested parties (Consulted Persons) that AEMO is publishing the Draft Determination on AEMO Procedures which have been amended in the Power of Choice Procedure changes in Package 3 consultation as a result of the Competition in Metering, Embedded Networks and Meter Replacement Processes rule changes (Amending Rules).
This consultation is being conducted in accordance with the Rules consultation requirements detailed in rule 8.9 of the NER.
Matter under Consultation
INSTRUMENT |
NEW / AMMENDED |
NER REFERENCE |
Glossary and Framework |
Amended |
7.16.1(f) |
Meter Data File Format |
Amended |
7.16.6 |
Metrology Procedure: Part A |
Amended |
7.16.3 |
MSATS Procedures: CATS Procedure Principles and Obligations |
Amended |
7.16.2 |
MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample (WIGS) NMIs |
Amended |
7.16.2 |
Service Level Procedures for MDP |
Amended |
7.16.6 |
Service Level Procedures for MP |
Amended |
7.16.6 |
Qualification Procedure |
Amended |
S7.2.1(b), S7.3.1(c), S7.7.1(b) |
Second Stage Rules Consultation
Draft Determination
|
Draft copies of Procedures (Clean copies)
|
Draft copies of Procedures (Track changed copies)
|
Participant Response Template - Second Stage Consultation
|
Appendix - Consolidated Responses to First Stage
Consultation submissions
|
Other documents and Guidelines updated due to Power of Choice changes
AEMO received submissions and has made updates to some of these documents. Please find below the final published MSATS guidelines and other documents :
- Exemption guideline (Small customer metering installations) (83 KB, pdf)
- Hints and Tips CATS and NMI Discovery (1.02 MB, pdf)
- MSATS CATS History Model (933 KB, pdf)
- Guide to role of Metering Coordinator (89 KB, pdf)
- MDM File format and upload process (2.09 MB, pdf)
Please note two further documents; Standing Data for MSATS and Special Sites and Technology Related conditions in the NEM will be published shortly.
Closing Date for Submissions
Submissions in response to this Notice of Second Stage of Rules Consultation should reach AEMO by 5.00pm AEST on 9 August 2017.
Please refer to the AEMO PoC webpage for further information.
For any queries on this consultation, please contact poc@aemo.com.au.