Final Report and Determination
Date of Notice: 27 October 2017
The publication of this Final Report and Determination (Final Report) completes the Rules consultation process conducted by AEMO to consider proposed changes to the Procedure for the Exercise of Reliability and Emergency Reserve Trader under the National Electricity Rules (NER).
This consultation was conducted under clauses 3.6.1, 3.6.2, and 3.6.2A of the National Electricity Rules (NER), in accordance with the Rules consultation requirements detailed in rule 8.9 of the NER.
Matter under Consultation
The matter for consultation was proposed changes to the Procedure for the Exercise of Reliability and Emergency Reserve Trader.
The Australian Energy Market Commission (AEMC) National Electricity Amendment Rule 2016 No. 5 repealed the expiry of Reliability and Emergency Reserve Trader (RERT), and reduced the maximum period where AEMO can enter into, or renegotiate, a reserve contract from nine months to ten weeks, effectively eliminating the “long notice” reserves.
This Rules change also required AEMO to amend its RERT procedures in accordance with clause 3.20.7(e) by 1 November 2017, to reflect the Amending Rule and the amended RERT guidelines.
The Consultation Process
The stages and timing for the completed consultation are below.
Process Stage | Indicative Stage |
Notice of first stage of consultation published | 13 April 2017 |
Submissions due on draft amended procedure | 23 May 2017 |
Draft Report Published | 14 August 2017 |
Submissions due on Draft Report | 28 August 2017 |
Final Consultation Report published | 29 September 2017 |
Amended RERT Procedure published | 29 September 2017 |
Changes on RERT Rules and Guidelines become effective | 01 November 2017 |
The publication of this Final Report marks the completion of the consultation.
Final Determination
AEMO did not receive any submissions in regards to the first or second stages of this consultation; therefore AEMO will amend the Procedure for the Exercise of Reliability and Emergency Reserve Trader in the form published with the first stage of Rules consultation on 13 April 2017.
-
27/10/2017
Final Report And Determination: Procedure For The Exercise Of Reliability And Emergency Reserve Trader – Amendment
2.01 MB -
14/08/2017
Notice of Second Stage of Consultation - RERT External Procedure - Consultation Draft Report and Determination
2.01 MB -
12/04/2017
Notice of First Stage Consultation for RERT Consultation
144.86 KB -
27/10/2017
Procedure for the Exercise of RERT v4.0 Draft
456.85 KB