Cancellation of a Non-Credible Contingency Event: Yallourn - Rowville 7 220 kV line and Yallourn - Rowville 8 220 kV line in VIC1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: VIC1
Lines: Yallourn - Rowville 7 220 kV and Yallourn - Rowville 8 220 kV
Cancellation time: 23/02/2025 15:54
Constraint set(s) revoked:
V-ROYP78_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Refer AEMO Electricity Market Notice 125043
Auto-generated on behalf of Manager NEM Real Time Operations
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 124994
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Pelican Point Power Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT at 1600 hrs 23/02/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0730 hrs 24/02/2025
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 25/02/2025 / further notice.
Pelican Point Power Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
[EventId:202502231450_confirmed] Prices for interval 23-Feb-2025 14:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1510 hrs on 23 February 2025
PRICES ARE NOW CONFIRMED for trading interval 23-Feb-2025 14:50.
In accordance with Market Notice 125047 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502231510_confirmed] Prices for interval 23-Feb-2025 15:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1510 hrs on 23 February 2025
PRICES ARE NOW CONFIRMED for trading interval 23-Feb-2025 15:10.
In accordance with Market Notice 125052 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502231505_confirmed] Prices for interval 23-Feb-2025 15:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1510 hrs on 23 February 2025
PRICES ARE NOW CONFIRMED for trading interval 23-Feb-2025 15:05.
In accordance with Market Notice 125050 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502231500_confirmed] Prices for interval 23-Feb-2025 15:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1510 hrs on 23 February 2025
PRICES ARE NOW CONFIRMED for trading interval 23-Feb-2025 15:00.
In accordance with Market Notice 125049 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502231455_confirmed] Prices for interval 23-Feb-2025 14:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1510 hrs on 23 February 2025
PRICES ARE NOW CONFIRMED for trading interval 23-Feb-2025 14:55.
In accordance with Market Notice 125048 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502231445_confirmed] Prices for interval 23-Feb-2025 14:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1510 hrs on 23 February 2025
PRICES ARE NOW CONFIRMED for trading interval 23-Feb-2025 14:45.
In accordance with Market Notice 125046 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 124993
TORRB2 TORRENS ISLAN at 0400 hrs 24/02/2025 to Remain synchronised and follow dispatch targets.
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 25/02/2025.
The direction update is issued at 1600 hrs 23/02/2025.
Manager NEM Real Time Operations