[EventId:202505051830_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 05 May 2025 18:30
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 5 May 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 5 May 2025.
Refer to market notice: 126877
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1830 hrs on 5 May 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202505051705_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 05 May 2025 17:05
Issued by Australian Energy Market Operator Ltd at 1705 hrs on 5 May 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 5 May 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1705 hrs on 5 May 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Inter-regional transfer limit variation - Greenbank - Mudgeeraba No. 836 275 kV Line - QLD region - 05/05/2025
Inter-regional transfer limit variation - Greenbank - Mudgeeraba No. 836 275 kV Line - QLD region - 05/05/2025
At 1336 hrs 05/05/2025 there was an unplanned outage of Greenbank - Mudgeeraba No. 836 275 kV Line.
The following constraint set(s) invoked at 1340 hrs 05/05/2025
Q-GBMU_835_836
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
CHG0102231:Pre-Prod MASTS 54.2 and eMDM Maintenance Release
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: MSATS - Consumer Administration and Transfer Solution(CATS)_PreProd
Change Title: Pre-Prod MASTS 54.2 and eMDM Maintenance Release
Change Start Date & Time: 06/05/2025 13:00:00
Change End Date & Time: 06/05/2025 17:00:00
Outage Start Date & Time: 06/05/2025 13:00:00
Outage End Date & Time: 06/05/2025 17:00:00
Environment: Pre-Production
Participant Impact and Requirements: Users will not be able to access MSATS during the outage period.
Meter data processing and RM reports will not be available during the outage period.
User Rights Management (URM) will continue to operate, however the administration screens will not be accessible.
MSATS B2B/B2M Transactions and B2B MSATS Screens will be unavailable during this outage
NMI Discovery will not be available during the outage period.
CDR and CDP will not be available during the outage period.
Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any planned/unplanned maintenance activities.
Inter-regional transfer limit variation - South Morang - Thomastown No 2 220 kV Line - VIC region - 03/05/2025
Inter-regional transfer limit variation -South Morang - Thomastown No 2 220 kV Line - VIC region - 03/05/2025
A planned outage of South Morang - Thomastown No 2 220 kV Line in the VIC region was scheduled from 0629 hrs 03/05/2025 to 1830 hrs 03/05/2025.
The outage has been completed and South Morang - Thomastown No 2 220 kV Line returned to service at 1615 hrs 03/05/2025
Constraint set(s) revoked: V-SMTT2
Manager NEM Real Time Operations
CHG0102918: Network Change Impacting Norwest and Brisbane Control Room Phone Network
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: Local Area Network
Change Title: Network Change Impacting Norwest and Brisbane Control Room Phone Network
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
CHG0102573: There will be no access to the STTM Production services
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: STTM - Scheduling & Dispatch - SPI
Change Title: There will be no access to the STTM Production services (SWEX/SWEXIE/MIS) for the duration of the outage. Please access outside these hours.
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
CHG0102888:Network Change Impacting Norwest Control Room Phone Network
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: Local Area Network
Change Title: Network Change Impacting Norwest Control Room Phone Network
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
CHG0102918: Network Change Impacting Norwest and Brisbane Control Room Phone Network
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: Local Area Network
Change Title: Network Change Impacting Norwest and Brisbane Control Room Phone Network
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.