Post-event dispatch conformance framework
Overview
AEMO has developed a WDR post-event dispatch conformance framework in consultation with stakeholders and the AER.
Dispatch conformance is the ability of a unit to respond to a dispatch instruction within a tolerable time and accuracy. Under the NER, AEMO must assess WDRU conformance with dispatch instructions and identify non-conformance.
The framework document includes a description of the dispatch conformance process and approach.
Key dates
Draft version released | 01 April 2021 |
Stakeholder (WDR CG) comments due | 27 April 2021 |
Final version published | 25 May 2021 |
Status
Final version: