127395RESERVE NOTICE04/06/2025 06:47:22 PM

Cancellation of Actual (LOR1) condition in the NSW region - 04/06/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 04/06/2025

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.127393 is cancelled at 1845 hrs 04/06/2025.

Manager NEM Real Time Operations
     
127394RESERVE NOTICE04/06/2025 06:14:34 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 04/06/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 04/06/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1800 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs

The capacity reserve requirement is 730 MW
The minimum capacity reserve available is 682 MW

Manager NEM Real Time Operations
     
127393RESERVE NOTICE04/06/2025 05:41:44 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 04/06/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 04/06/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1800 hrs

The capacity reserve requirement is 1540 MW
The minimum capacity reserve available is 1540 MW

Manager NEM Real Time Operations
     
127359RESERVE NOTICE02/06/2025 06:17:40 PM

Cancellation of Actual (LOR1) condition in the NSW region - 02/06/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 02/06/2025

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.127357 is cancelled at 1815 hrs 02/06/2025.

Manager NEM Real Time Operations
     
127357RESERVE NOTICE02/06/2025 05:41:59 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 02/06/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 02/06/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1740 hrs.

The Actual LOR1 condition is forecast to exist until 1830 hrs.

The forecast capacity reserve requirement is 1773 MW.
The minimum capacity reserve available is 1559 MW.


Manager NEM Real Time Operations
     
127349RESERVE NOTICE01/06/2025 07:12:29 PM

Cancellation of Actual (LOR1) condition in the NSW region - 01/06/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 01/06/2025

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.127348 is cancelled at 1910 hrs 01/06/2025.

Manager NEM Real Time Operations
     
127348RESERVE NOTICE01/06/2025 06:54:26 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 01/06/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 01/06/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1830 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs

The capacity reserve requirement is 1666 MW
The minimum capacity reserve available is 1646 MW

Manager NEM Real Time Operations
     
127347RESERVE NOTICE01/06/2025 05:40:16 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW Region on 01/06/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 01/06/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.

The Actual LOR1 condition is forecast to exist until 1830 hrs.

The forecast capacity reserve requirement is 1694 MW.
The minimum capacity reserve available is 1568 MW.


Manager NEM Real Time Operations
     
127304POWER SYSTEM EVENTS27/05/2025 12:30:40 PM

Update - Non-credible contingency event - NSW region - 07/03/2025

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - NSW region - 07/03/2025

Refer AEMO Electricity Market Notice 125536

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will no longer reclassify this event as a credible contingency event.

Region: NSW

Elements:
- Lismore132 - Mullumbimby 9U6 132kV Line
- Lismore132 - Mullumbimby 9U7 132kV Line
- Ewingsdale - Mullumbimby 9G5 132kV Line

Duration: 1730 hrs 11/03/2025 until 1230 hrs 27/05/2025

Constraint set(s) invoked: NONE