127043RESERVE NOTICE13/05/2025 05:15:08 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/05/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:


[1.] From 1730 hrs 13/05/2025 to 1800 hrs 13/05/2025.
The forecast capacity reserve requirement is 1385 MW.
The minimum capacity reserve available is 1070 MW.


Manager NEM Real Time Operations
     
127034RESERVE NOTICE13/05/2025 04:46:56 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/05/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 127025 is cancelled at 1645 hrs 13/05/2025.

Manager NEM Real Time Operations
     
127032SETTLEMENTS RESIDUE13/05/2025 04:35:24 PM

[EventId:202505131635_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 13 May 2025 16:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1635 hrs on 13 May 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 13 May 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1635 hrs on 13 May 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
127026SETTLEMENTS RESIDUE13/05/2025 03:45:15 PM

[EventId:202505131545_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 13 May 2025 15:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1545 hrs on 13 May 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 13 May 2025.

Refer to market notice: 127024

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1545 hrs on 13 May 2025.

This is an AEMO autogenerated Market Notice.
     
127025RESERVE NOTICE13/05/2025 03:44:25 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/05/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:


[1.] From 1730 hrs 14/05/2025 to 1800 hrs 14/05/2025.
The forecast capacity reserve requirement is 1385 MW.
The minimum capacity reserve available is 1366 MW.


Manager NEM Real Time Operations
     
127024SETTLEMENTS RESIDUE13/05/2025 03:00:29 PM

[EventId:202505131500_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 13 May 2025 15:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1500 hrs on 13 May 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 13 May 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1500 hrs on 13 May 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
126941SETTLEMENTS RESIDUE07/05/2025 07:30:31 PM

[EventId:202505071930_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 07 May 2025 19:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1930 hrs on 7 May 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 May 2025.

Refer to market notice: 126940

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1930 hrs on 7 May 2025.

This is an AEMO autogenerated Market Notice.
     
126940SETTLEMENTS RESIDUE07/05/2025 05:35:32 PM

[EventId:202505071735_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 07 May 2025 17:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1735 hrs on 7 May 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 7 May 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1735 hrs on 7 May 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
126909SETTLEMENTS RESIDUE06/05/2025 05:00:30 PM

[EventId:202505061700_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 06 May 2025 17:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1700 hrs on 6 May 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 6 May 2025.

Refer to market notice: 126908

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 1700 hrs on 6 May 2025.

This is an AEMO autogenerated Market Notice.
     