125255MARKET INTERVENTION04/03/2025 02:30:48 PM

Cancellation - AEMO Intervention Event - SA region 01/03/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 01/03/2025

Refer to Market Notice 125140

The AEMO Intervention Event and all associated directions are cancelled from 1430 hrs on 04/03/2025.


Manager NEM Real Time Operations
     
125254MARKET INTERVENTION04/03/2025 02:30:23 PM

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 125225

Direction is cancelled from: 1430 hrs 04/03/2025

Manager NEM Real Time Operations
     
125253MARKET INTERVENTION04/03/2025 01:29:12 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0700 hrs 05/03/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
125252SETTLEMENTS RESIDUE04/03/2025 01:00:28 PM

[EventId:202503041300_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 04 March 2025 13:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1300 hrs on 4 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 4 March 2025.

Refer to market notice: 125250

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1300 hrs on 4 March 2025.

This is an AEMO autogenerated Market Notice.
     
125250SETTLEMENTS RESIDUE04/03/2025 11:05:26 AM

[EventId:202503041105_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 04 March 2025 11:05

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1105 hrs on 4 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 4 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1105 hrs on 4 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
125230MARKET INTERVENTION04/03/2025 03:59:57 AM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

Refer to Market Notice 125211

Direction is cancelled from: 0400 hrs 04/03/2025

Manager NEM Real Time Operations
     
125229SETTLEMENTS RESIDUE03/03/2025 05:30:38 PM

[EventId:202503031730_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 03 March 2025 17:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1730 hrs on 3 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2025.

Refer to market notice: 125226

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1730 hrs on 3 March 2025.

This is an AEMO autogenerated Market Notice.
     
125228SETTLEMENTS RESIDUE03/03/2025 05:30:30 PM

[EventId:202503031730_NRM_NSW1_QLD1_stopped] NEGRES CONSTRAINT NRM_NSW1_QLD1 ceased operating from 03 March 2025 17:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1730 hrs on 3 March 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to QLD - 3 March 2025.

Refer to market notice: 125227

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to QLD directional interconnector.

The negative residue constraint NRM_NSW1_QLD1 ceased operating at 1730 hrs on 3 March 2025.

This is an AEMO autogenerated Market Notice.
     
125227SETTLEMENTS RESIDUE03/03/2025 04:45:49 PM

[EventId:202503031645_NRM_NSW1_QLD1_started] NEGRES CONSTRAINT NRM_NSW1_QLD1 started operating from 03 March 2025 16:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1645 hrs on 3 March 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to QLD - 3 March 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to QLD directional interconnector.

The negative residue constraint set NRM_NSW1_QLD1 commenced operating from 1645 hrs on 3 March 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     