Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 125695
PPCCGT PELICAN POINT at 0730 hrs 16/03/2025 to Remain synchronised and follow dispatch targets.
The PPCCGT PELICAN POINT direction is now expected to stay in place until 0400 hrs 18/03/2025.
The direction update is issued at 1600 hrs 16/03/2025.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 125667
TORRB2 TORRENS ISLAN at 0130 hrs 16/03/2025 to Remain synchronised and follow dispatch targets.
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 18/03/2025.
The direction update is issued at 1600 hrs 16/03/2025.
Manager NEM Real Time Operations
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 125670
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Pelican Point Power Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT at 0600 hrs 16/03/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0730 hrs 16/03/2025
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 17/03/2025 / further notice.
Pelican Point Power Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 125669
Direction is cancelled from: 0555 hrs 16/03/2025
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 15/03/2025
Cancellation of Actual (LOR1) condition in the NSW region - 15/03/2025
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.125691 is cancelled at 1835 hrs 15/03/2025.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 15/03/2025
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 15/03/2025
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1830 hrs
The capacity reserve requirement is 1642 MW
The minimum capacity reserve available is 1550 MW
Manager NEM Real Time Operations
[EventId:202503151620_confirmed] Prices for interval 15-Mar-2025 16:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1645 hrs on 15 March 2025
PRICES ARE NOW CONFIRMED for trading interval 15-Mar-2025 16:20.
In accordance with Market Notice 125673 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503151645_confirmed] Prices for interval 15-Mar-2025 16:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1645 hrs on 15 March 2025
PRICES ARE NOW CONFIRMED for trading interval 15-Mar-2025 16:45.
In accordance with Market Notice 125681 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503151640_confirmed] Prices for interval 15-Mar-2025 16:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1645 hrs on 15 March 2025
PRICES ARE NOW CONFIRMED for trading interval 15-Mar-2025 16:40.
In accordance with Market Notice 125679 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.