Market Notices

127366MARKET SYSTEMS03/06/2025 03:14:36 PM

CHG0103386 | Production | Renewal and update of AEMO's FBS-Prod-Hub.aemo.com.au server certificate

AEMO's FRC Gas Hub web services need to have their server certificates updated every year with new certificates to replace the expiring one.

Participants connecting to these endpoints or receiving requests from AEMO's FRC Gas Hub platforms and have authorisation mechanisms like certificate fingerprinting in place will notice a change in AEMO's server's certificate fingerprint and will need to update their systems accordingly.

The certificate relates to "FBS-Prod-Hub.aemo.com.au" certificate and relates to the following domains.
FBS-Prod-Hub.aemo.com.au
apis.prod.aemo.com.au
hub.aemo.com.au
prod.frchub.net
apis.prod.marketnet.net.au
hub.marketnet.net.au

Participants WILL need to update the profile that communicates with the above domains. This will need to be done to avoid the inability to send messages to the relay.

The certificates can be downloaded from the link below: https://www.digicert.com/secure/download-certificate/0zb6n7hdvs5c84j41twxz695ft63p2m

Change duration will be as below.
Start - 22/06/2025 10:00:00 AM AEST
End - 22/06/2025 14:00:00 PM AEST
     
127363MARKET SYSTEMS03/06/2025 01:49:43 PM

CHG0103461 | EMMS Pre-Production Systems will be transferred to the alternative datacentre for maintenance activities.

EMMS Pre-Production Systems will be transferred to the alternative datacentre for maintenance activities .

Change Start Date & Time 05/06/2025 08:00:00 AEST
Change End Date & Time 06/06/2025 17:00:00 AEST
Outage Start Date & Time 05/06/2025 08:00:00 AEST
Outage End Date & Time 05/06/2025 21:00:00 AEST

EMMS Pre-Production Systems will be transferred to the alternative datacentre for maintenance activities. Maintenance activities will be conducted on 5th June.

During the window,FPP calculations may be delayed at various points.

Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
     
127335MARKET SYSTEMS29/05/2025 07:39:52 PM

Resolved - INC0145274 - Markets Portal - Unable to View Menu

AEMO ELECTRICITY MARKET NOTICE

SERVICE INTERRUPTION - RESOLVED

The service interruption relating to the Market Portal has been resolved.

For further enquiries please contact the AEMO Support Hub
Phone: 1300 236 600
Email: supporthub@aemo.com.au
     
127334SETTLEMENTS RESIDUE29/05/2025 05:35:27 PM

[EventId:202505291735_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 29 May 2025 17:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1735 hrs on 29 May 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 29 May 2025.

Refer to market notice: 127331

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1735 hrs on 29 May 2025.

This is an AEMO autogenerated Market Notice.
     
127331SETTLEMENTS RESIDUE29/05/2025 04:00:34 PM

[EventId:202505291600_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 29 May 2025 16:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1600 hrs on 29 May 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 29 May 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1600 hrs on 29 May 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
127330GENERAL NOTICE29/05/2025 02:42:44 PM

Fast Frequency Response Market - Local dispatch of Very Fast Contingency FCAS in SA and QLD

AEMO ELECTRICITY MARKET NOTICE

Following a review of the operation of the Very Fast FCAS market, AEMO will commence local dispatch of Very Fast FCAS in the South Australia (SA) and Queensland (QLD) regions from 10th June 2025, during periods where islanding of the region is considered credible.

An initial dispatch cap of 100 MW will apply in the SA region, and 20 MW in the QLD region. These caps will be reviewed and updated regularly.

From the same date, AEMO will also dispatch Very Fast FCAS in the QLD region when an actual islanding event occurs. In this scenario, no dispatch cap will apply.

Dispatch of Very Fast FCAS in the SA region under actual islanding conditions commenced in 2024. Refer to Market Notice 117238 for further details.

For more information on the Fast Frequency Response (FFR) initiative, please visit:
https://www.aemo.com.au/initiatives/major-programs/fast-frequency-response

Andrew Groom
AEMO Operations
     
127329SETTLEMENTS RESIDUE28/05/2025 06:45:16 PM

[EventId:202505281845_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 28 May 2025 18:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1845 hrs on 28 May 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 May 2025.

Refer to market notice: 127328

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1845 hrs on 28 May 2025.

This is an AEMO autogenerated Market Notice.
     
127328SETTLEMENTS RESIDUE28/05/2025 06:30:27 PM

[EventId:202505281830_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 28 May 2025 18:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1830 hrs on 28 May 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 May 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1830 hrs on 28 May 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
127327SETTLEMENTS RESIDUE28/05/2025 06:00:26 PM

[EventId:202505281800_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 28 May 2025 18:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1800 hrs on 28 May 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 28 May 2025.

Refer to market notice: 127323

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1800 hrs on 28 May 2025.

This is an AEMO autogenerated Market Notice.
     