AusNet Services RIT-T: Maintain reliable transmission network services from Redcliffs Terminal Station

08/12/2022
Market Network Service Provider
StageProject Specification Consultation Report
ConvenorAEMO NSP
Initiated08/12/2022
Accepting submissions?No
Submissions close05/07/2023

Project Assessment Draft Report – Summary

Regulatory Investment Test – Transmission – May 2023

This Regulatory Investment Test for Transmission (RIT-T) evaluates options to maintain reliable transmission network services at Redcliffs Terminal Station (RCTS). Publication of this Project Assessment Draft Report (PADR) represents the second step in the RIT-T process in accordance with clause 5.16 of the National Electricity Rules (NER) and section 4.2 of the RIT-T Application Guidelines . The Project Specification Consultation Report (PSCR), which represents the first step in the RIT-T process, was published in December 2022.

No non-network proposals were received during the RIT-T PSCR consultation.

The preferred option to address the asset failure risk at RCTS is an integrated replacement of the transformers that are in poor or very poor condition before the end of 2027.

AusNet Services welcomes written submissions on the issues and the credible options presented in this PADR. Submissions should be emailed to rittconsultations@ausnetservices.com.au on or before 5 July 2023. In the subject field, please reference ‘RIT-T PADR Redcliffs Terminal Station.’

Submissions will be published on AusNet Services’ and AEMO’s websites. If you do not wish for your submission to be made public, please clearly stipulate this at the time of lodgment.

X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm