Filter by category
Filter by Date
Direction - SA region to AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Direction - SA region to AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 120499
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN at 1445 hrs 15/11/2024
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 2330 hrs 15/11/2024
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 1730 hrs 16/11/2024.
AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Update - Foreseeable AEMO intervention in SA region
Update - Foreseeable AEMO intervention in SA region
Refer AEMO Electricity Market Notice 120476
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 2330 hrs 15/11/2024.
The foreseeable circumstance requiring the need for intervention is Voltage.
AEMO estimates that, in the absence of sufficient market response by 1445 hrs 15/11/2024, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations
[EventId:202411151330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 15 November 2024 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 15 November 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 November 2024.
Refer to market notice: 120485
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 15 November 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202411151145_confirmed] Prices for interval 15-Nov-2024 11:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1205 hrs on 15 November 2024
PRICES ARE NOW CONFIRMED for trading interval 15-Nov-2024 11:45.
In accordance with Market Notice 120484 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411151205_confirmed] Prices for interval 15-Nov-2024 12:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1205 hrs on 15 November 2024
PRICES ARE NOW CONFIRMED for trading interval 15-Nov-2024 12:05.
In accordance with Market Notice 120489 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411151200_confirmed] Prices for interval 15-Nov-2024 12:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1205 hrs on 15 November 2024
PRICES ARE NOW CONFIRMED for trading interval 15-Nov-2024 12:00.
In accordance with Market Notice 120488 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411151155_confirmed] Prices for interval 15-Nov-2024 11:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1205 hrs on 15 November 2024
PRICES ARE NOW CONFIRMED for trading interval 15-Nov-2024 11:55.
In accordance with Market Notice 120487 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411151150_confirmed] Prices for interval 15-Nov-2024 11:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1205 hrs on 15 November 2024
PRICES ARE NOW CONFIRMED for trading interval 15-Nov-2024 11:50.
In accordance with Market Notice 120486 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411151140_confirmed] Prices for interval 15-Nov-2024 11:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1205 hrs on 15 November 2024
PRICES ARE NOW CONFIRMED for trading interval 15-Nov-2024 11:40.
In accordance with Market Notice 120483 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.