119903RESERVE NOTICE05/11/2024 11:06:55 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 06/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 119896 has been updated at 1000 hrs 05/11/2024 to the following:

From 1800 hrs to 1900 hrs 06/11/2024.
The forecast capacity reserve requirement is 788 MW.
The minimum capacity reserve available is 536 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 06/11/2024

AEMO Operations
     
119902RESERVE NOTICE05/11/2024 11:05:23 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 07/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 119895 has been updated at 1000 hrs 05/11/2024 to the following:

From 1230 hrs to 1930 hrs 07/11/2024.
The forecast capacity reserve requirement is 1296 MW.
The minimum capacity reserve available is 786 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 06/11/2024

AEMO Operations
     
119901GENERAL NOTICE05/11/2024 10:47:11 AM

Project Energy Connect (PEC-1) testing 6th November 2024 for flows in both directions

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 118945

There is an opportunity for testing Project Energy Connect (PEC-1) for flows in both directions up to 50 MW on 6th November from 07:00hrs to 11:00hrs

This test includes a trip and reclose of a line in South Australia.

Please also refer to the published formal PEC Stage 1 and HIC capacity release testing information at the following link https://aemo.com.au/-/media/files/stakeholder_consultation/consultations/nem-consultations/2023/project-energyconnect-stage-1-and-hic-capacity-release/pec-stage-1-and-hic---final-test-program.pdf?la=en.

Ben Blake
AEMO Operations
     
119899GENERAL NOTICE05/11/2024 10:24:54 AM

NEM Local Temperature Alerts for QLD, SA from 05 Nov 2024 to 09 Nov 2024

AEMO ELECTRICITY MARKET NOTICE

AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.

QLD
Dalby Ap (37+ Deg C): 5th Nov, 6th Nov, 7th Nov, 8th Nov, 9th Nov

SA
Port Augusta Ap (39+ Deg C): 5th Nov

The NEM Local Temperature Alert Levels are:

Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.

AEMO requests Market Participants to:

1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,

2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.

Further information is available at:

https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts

AEMO Operations Planning
     
119897RESERVE NOTICE05/11/2024 09:00:45 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 07/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 119890 has been updated at 0800 hrs 05/11/2024 to the following:

From 1700 hrs to 1930 hrs 07/11/2024.
The forecast capacity reserve requirement is 853 MW.
The minimum capacity reserve available is 564 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 06/11/2024.

AEMO Operations
     
119896RESERVE NOTICE05/11/2024 08:59:23 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 06/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 119850 has been updated at 0800 hrs 05/11/2024 to the following:

From 1800 hrs to 1830 hrs 06/11/2024.
The forecast capacity reserve requirement is 737 MW.
The minimum capacity reserve available is 698 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 06/11/2024.

AEMO Operations
     
119895RESERVE NOTICE05/11/2024 08:58:07 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 07/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 119891 has been updated at 0800 hrs 05/11/2024 to the following:

From 1300 hrs to 2000 hrs 07/11/2024.
The forecast capacity reserve requirement is 1418 MW.
The minimum capacity reserve available is 704 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 06/11/2024.

AEMO Operations
     
119894RESERVE NOTICE05/11/2024 08:56:59 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 06/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 119888 has been updated at 0800 hrs 05/11/2024 to the following:

From 1730 hrs to 1900 hrs 06/11/2024.
The forecast capacity reserve requirement is 1182 MW.
The minimum capacity reserve available is 698 MW.

AEMO is seeking a market response.

AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0600 hrs on 06/11/2024.

AEMO Operations
     
119892MINIMUM SYSTEM LOAD05/11/2024 08:34:30 AM

Cancellation - Forecast Minimum System Load 2 (MSL2) in the VIC Region on 10/11/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Forecast MSL2, VIC Region at 0700 hrs 05/11/2024.

Refer to Market Notice 119852 for Forecast MSL2.