Market Notices

119800RESERVE NOTICE02/11/2024 02:46:38 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 04/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119746 has been updated at 1400 hrs 02/11/2024 to the following:

1. From 1800 hrs to 1900 hrs 04/11/2024.
The forecast capacity reserve requirement is 1120 MW.
The minimum capacity reserve available is 916 MW.

Manager NEM Real Time Operations
     
119799PRICES SUBJECT TO REVIEW02/11/2024 02:40:20 PM

[EventId:202411021445_review] Prices for interval 02-Nov-2024 14:45 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1440 hrs on 2 November 2024

PRICES ARE SUBJECT TO REVIEW for trading interval 02-Nov-2024 14:45.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
     
119798PRICES SUBJECT TO REVIEW02/11/2024 02:35:19 PM

[EventId:202411021440_review] Prices for interval 02-Nov-2024 14:40 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1435 hrs on 2 November 2024

PRICES ARE SUBJECT TO REVIEW for trading interval 02-Nov-2024 14:40.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
     
119797MARKET INTERVENTION02/11/2024 04:00:20 PM

Update Direction - Synergen Power Pty Limited - MINTARO MINTARO GAS

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - Synergen Power Pty Limited - MINTARO MINTARO GAS

Refer AEMO Electricity Participant Notice 119748

The MINTARO MINTARO GAS direction is now expected to end at 1700 hrs 03/11/2024.

The direction update is issued at 1600 hrs 02/11/2024.

Manager NEM Real Time Operations
     
119796MARKET INTERVENTION02/11/2024 03:59:09 PM

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN

Refer AEMO Electricity Participant Notice 119745

The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 04/11/2024.

The direction update is issued at 1600 hrs 02/11/2024.

Manager NEM Real Time Operations
     
119795SETTLEMENTS RESIDUE02/11/2024 02:31:24 PM

[EventId:202411021430_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 02 November 2024 14:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1430 hrs on 2 November 2024

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 November 2024.

Refer to market notice: 119781

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1430 hrs on 2 November 2024.

This is an AEMO autogenerated Market Notice.
     
119794PRICES SUBJECT TO REVIEW02/11/2024 02:30:21 PM

[EventId:202411021435_review] Prices for interval 02-Nov-2024 14:35 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1430 hrs on 2 November 2024

PRICES ARE SUBJECT TO REVIEW for trading interval 02-Nov-2024 14:35.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
     
119793RECLASSIFY CONTINGENCY02/11/2024 02:27:35 PM

Reclassification of a Non-Credible Contingency Event: Collinsville - Stoney Creek 7306 132KV LINE line and Collinsville - Newlands 7121 132KV LINE line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Collinsville - Stoney Creek 7306 132KV LINE and Collinsville - Newlands 7121 132KV LINE

Duration: 02/11/2024 14:27 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
     
119792RESERVE NOTICE02/11/2024 02:48:43 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 07/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119744 has been updated at 1400 hrs 02/11/2024 to the following:

1. From 1700 hrs to 1730 hrs 07/11/2024.
The forecast capacity reserve requirement is 867 MW.
The minimum capacity reserve available is 840 MW.

2. From 1900 hrs to 1930 hrs 07/11/2024.
The forecast capacity reserve requirement is 978 MW.
The minimum capacity reserve available is 655 MW.

Manager NEM Real Time Operations
     