PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 22/01/2024 to 1900 hrs 22/01/2024.
The forecast capacity reserve requirement is 631 MW.
The minimum capacity reserve available is 583 MW.
AEMO is seeking a market response.
AEMO estimates the latest time at which it would need to intervene through an AEMO intervention event is 1430 hrs on 22/01/2024.
Manager NEM Real Time Operations
[EventId:202401221100_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 22 January 2024 11:00
Issued by Australian Energy Market Operator Ltd at 1100 hrs on 22 January 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 22 January 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1100 hrs on 22 January 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113596 is cancelled at 1040 hrs 22/01/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 22/01/2024 to 1900 hrs 22/01/2024.
The forecast capacity reserve requirement is 599 MW.
The minimum capacity reserve available is 533 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
OR
Manager NEM Real Time Operations
[EventId:202401212130_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 21 January 2024 21:30
Issued by Australian Energy Market Operator Ltd at 2130 hrs on 21 January 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 21 January 2024.
Refer to market notice: 113580
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 2130 hrs on 21 January 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202401212035_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 21 January 2024 20:35
Issued by Australian Energy Market Operator Ltd at 2035 hrs on 21 January 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 21 January 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 2035 hrs on 21 January 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202401211955_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 21 January 2024 19:55
Issued by Australian Energy Market Operator Ltd at 1955 hrs on 21 January 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 21 January 2024.
Refer to market notice: 113568
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1955 hrs on 21 January 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202401211945_NRM_NSW1_QLD1_stopped] NEGRES CONSTRAINT NRM_NSW1_QLD1 ceased operating from 21 January 2024 19:45
Issued by Australian Energy Market Operator Ltd at 1945 hrs on 21 January 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to QLD - 21 January 2024.
Refer to market notice: 113577
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to QLD directional interconnector.
The negative residue constraint NRM_NSW1_QLD1 ceased operating at 1945 hrs on 21 January 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202401211930_NRM_NSW1_QLD1_started] NEGRES CONSTRAINT NRM_NSW1_QLD1 started operating from 21 January 2024 19:30
Issued by Australian Energy Market Operator Ltd at 1930 hrs on 21 January 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to QLD - 21 January 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to QLD directional interconnector.
The negative residue constraint set NRM_NSW1_QLD1 commenced operating from 1930 hrs on 21 January 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.