Filter by category
Filter by Date
Direction - VIC region to Snowy Hydro Limited - MURR2-3 MURRAY2
Direction - VIC region to Snowy Hydro Limited - MURR2-3 MURRAY2
Refer to Market Notice 120404
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Snowy Hydro Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Snowy Hydro Limited - MURR2-3 MURRAY2 at 0900 hrs 14/11/2024
Type of resource: generating unit operating as synchronous condenser
Required actions: Synchronise and operate as a synchronous condenser at 0930 hrs 14/11/2024
Services provided: System Strength
Circumstances necessitating the Direction:System Strength
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 14/11/2024
Snowy Hydro Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Direction - VIC region to Snowy Hydro Limited - MURR2-2 MURRAY2
Direction - VIC region to Snowy Hydro Limited - MURR2-2 MURRAY2
Refer to Market Notice 120404
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Snowy Hydro Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Snowy Hydro Limited - MURR2-2 MURRAY2 at 0900 hrs 14/11/2024
Type of resource: generating unit operating as synchronous condenser
Required actions: Synchronise and operate as a synchronous condenser at 0930 hrs 14/11/2024
Services provided: System Strength
Circumstances necessitating the Direction:System Strength
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 14/11/2024.
Snowy Hydro Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Direction - VIC region to EnergyAustralia Ecogen Pty Ltd - JLB02 JEERALANG B PO
Direction - VIC region to EnergyAustralia Ecogen Pty Ltd - JLB02 JEERALANG B PO
Refer to Market Notice 120404
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to EnergyAustralia Ecogen Pty Ltd. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: EnergyAustralia Ecogen Pty Ltd - JLB02 JEERALANG B PO at 0900 hrs 14/11/2024
Type of resource: generating unit
Required actions: Synchronise and follow dispatch targets at 0930 hrs 14/11/2024
Services provided: System Strength
Circumstances necessitating the Direction:System Strength
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 14/11/2024.
EnergyAustralia Ecogen Pty Ltd does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Direction - VIC region to EnergyAustralia Ecogen Pty Ltd - JLB01 JEERALANG B PO
Direction - VIC region to EnergyAustralia Ecogen Pty Ltd - JLB01 JEERALANG B PO
Refer to Market Notice 120404
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to EnergyAustralia Ecogen Pty Ltd. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: EnergyAustralia Ecogen Pty Ltd - JLB01 JEERALANG B PO at 0900 hrs 14/11/2024
Type of resource: generating unit
Required actions: Synchronise and follow dispatch targets at 0930 hrs 14/11/2024
Services provided: System Strength
Circumstances necessitating the Direction:System Strength
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 14/11/2024.
EnergyAustralia Ecogen Pty Ltd does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Direction - VIC region 14/11/2024
Direction - VIC region 14/11/2024
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the VIC region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 0905 hrs on 14/11/2024.
Intervention pricing does not apply to this AEMO intervention event.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
Manager NEM Real Time Operations
Update - Foreseeable AEMO intervention in VIC region
Update - Foreseeable AEMO intervention in VIC region
Refer AEMO Electricity Market Notice 120401
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the VIC region from 0930 hrs 14/11/2024.
The foreseeable circumstance requiring the need for intervention is System Strength.
AEMO estimates that, in the absence of sufficient market response by 0900 hrs 14/11/2024, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in VIC region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in VIC region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the VIC region from 0930 hrs 14/11/2024.
The foreseeable circumstance requiring the need for intervention is System Strength.
Manager NEM Real Time Operations
[EventId:202411131900_review] Prices for interval 13-Nov-2024 19:00 are subject to review
Issued by Australian Energy Market Operator Ltd at 1855 hrs on 13 November 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 13-Nov-2024 19:00.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202411131855_review] Prices for interval 13-Nov-2024 18:55 are subject to review
Issued by Australian Energy Market Operator Ltd at 1850 hrs on 13 November 2024
PRICES ARE SUBJECT TO REVIEW for trading interval 13-Nov-2024 18:55.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.