STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 05/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114161 has been updated at 1400 hrs 03/02/2024 to the following:
[1.] From 1730 hrs 05/02/2024 to 1830 hrs 05/02/2024.
The forecast capacity reserve requirement is 1689 MW.
The minimum capacity reserve available is 1252 MW.
[2.] From 1900 hrs 05/02/2024 to 2130 hrs 05/02/2024.
The forecast capacity reserve requirement is 1653 MW.
The minimum capacity reserve available is 1253 MW.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 06/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114160 is cancelled at 1400 hrs 03/02/2024.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 05/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114159 has been updated at 1400 hrs 03/02/2024 to the following:
From 1830 hrs 05/02/2024 to 1900 hrs 05/02/2024.
The forecast capacity reserve requirement is 1265 MW.
The minimum capacity reserve available is 1182 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 06/02/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 114158 has been updated at 1400 hrs 03/02/2024 to the following:
From 1830 hrs 05/02/2024 to 1900 hrs 05/02/2024.
The forecast capacity reserve requirement is 1265 MW.
The minimum capacity reserve available is 1182 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 04/02/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 114202 has been updated at 1400 hrs to the following:
From 1730 hrs 04/02/2024 to 1900 hrs 04/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1126 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 04/02/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1830 hrs 04/02/2024 to 1900 hrs 04/02/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1287 MW.
Manager NEM Real Time Operations
Possible intervention to manage power system security in South Australia (SA) Region
Possible intervention to manage power system security in South Australia (SA) Region
The synchronous generating units currently expected to be synchronised in SA from 0000 hrs 05/02/2024 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.
AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
Possible intervention to manage power system security in SA region
Possible intervention to manage power system security in SA region
The synchronous generating units currently expected to be synchronised in SA from 0700 hrs 04/02/2024 will be inadequate to maintain a secure operating state in SA .
AEMO estimates that, in the absence of sufficient market response by 1700 hrs 03/02/2024, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
Update - Direction - SA Region - 28/01/2024
Update - Direction - SA Region - 28/01/2024
Refer Market Notice 113930
The AEMO intervention event that commenced from interval ending 1705 hrs on 28/01/2024 is continuing.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
Manager NEM Real Time Operations