Filter by category
Filter by Date
Inter-regional transfer limit variation - Tailem Bend 275 kV Capacitor - SA region - 19/04/2024
Inter-regional transfer limit variation - Tailem Bend 275 kV Capacitor - SA region - 19/04/2024
At 2341 hrs 19/04/2024 there was an unplanned outage of the Tailem Bend 275 kV Capacitor.
The following constraint set(s) invoked at 0005 hrs 20/04/2024
S-TBCP1
This constraint set(s) contains equations with the following interconnectors on the LHS.
V-SA
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Murraylink interconnector - VIC and SA regions - 19/04/2024
Inter-regional transfer limit variation - Murraylink interconnector - VIC and SA regions - 19/04/2024
A planned outage of Murraylink interconnector was scheduled from 0800 hrs 24/03/2024 to 1700 hrs 27/04/2024.
The outage has been completed and Murraylink interconnector returned to service at 1710 hrs 19/04/2024
Constraint set(s) revoked: I-MURRAYLINK
This constraint set(s) contains equations with the following interconnectors on the LHS.
V-S-MNSP1
VIC1-NSW1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Tamworth No1 SVC Protection system- NSW region - 18/04/2024
Inter-regional transfer limit variation - Tamworth No1 SVC Protection system - NSW region - 18/04/2024
At 1900 hrs 18/04/2024 there was a short notice outage of Tamworth No1 SVC protection system.
The following constraint set(s) invoked at 1900 hrs 18/04/2024
N-TW_SVC
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Update - Non-credible contingency event - VIC region - 17/04/2024
Update - Non-credible contingency event - VIC region - 17/04/2024
Refer AEMO Electricity Market Notice 116160
At 0610 hrs the Heywood No 2 500 kV bus was returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Heywood No 2 500 kV bus - VIC region - 17/04/2024
Inter-regional transfer limit variation - Heywood No 2 500 kV bus - VIC region - 17/04/2024
Refer market notice 116160
At 0414 hrs 17/04/2024 there was an unplanned outage of Heywood No 2 500 kV bus.
The following constraint set(s) invoked at 0430 hrs 17/04/2024
F-I-HYSE
S-X_BC_CP
V-HYTX_M12
V-HY_500BUS
This constraint set(s) contains equations with the following interconnectors on the LHS.
V-S-MNSP1, V-SA, T-V-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Non-credible contingency event - VIC region - 17/04/2024
Non-credible contingency event - VIC region - 17/04/2024
At 0414 hrs the Heywood No 2 500 kV bus tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - constraint automation to manage Power System Security in SA region - 16/04/2024
In order to maintain the power system in a secure operating state in the SA region, AEMO has invoked automated constraint set CA_BRIS_55306556 from 1150 hrs until further notice.
This constraint set contains equations with the following interconnector on the LHS;
V-SA
Refer to AEMO Network Outage Scheduler (NOS) for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Tamworth No1 SVC Protection system- NSW region - 15/04/2024
Inter-regional transfer limit variation - Tamworth No1 SVC Protection system - NSW region - 15/04/2024
At 1635 hrs 15/04/2024 there was a short notice outage of Tamworth No1 SVC protection system.
The following constraint set(s) invoked at 1650 hrs 15/04/2024
N-TW_SVC
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Tamworth No1 SVC - NSW region - 15/04/2024
Inter-regional transfer limit variation - Tamworth No1 SVC - NSW region - 15/04/2024
At 1155 hrs 15/04/2024 there was an unplanned outage of Tamworth No1 SVC.
The following constraint set(s) invoked at 1200 hrs 15/04/2024
N-TW_SVC
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations