PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/10/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119597 has been updated at 0745 hrs to the following:
[1.] From 1800 hrs 29/10/2024 to 1900 hrs 29/10/2024.
The forecast capacity reserve requirement is 1037 MW.
The minimum capacity reserve available is 947 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119569 is cancelled at 1800 hrs 28/10/2024
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/10/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119565 has been updated at 1550 hrs to the following:
[1.] From 1800 hrs 29/10/2024 to 1930 hrs 29/10/2024.
The forecast capacity reserve requirement is 1036 MW.
The minimum capacity reserve available is 721 MW.
Manager NEM Real Time Operations
Cancellation of Minimum System Load 1 (MSL1) in the VIC Region on 03/11/2024
Cancellation - MSL1- VIC Region at 1400 hrs 28/10/2024.
Refer to Market Notice 119497 for Forecast MSL1.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 04/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1730 hrs to 2000 hrs 04/11/2024.
The forecast capacity reserve requirement is 995 MW.
The minimum capacity reserve available is 590 MW.
AEMO Operations
Forecast Minimum System Load 1 (MSL1) in the VIC Region on 02/11/2024
AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the Victorian region on 02/11/2024.
Minimum regional demand is forecast to be 1491 MW at 1230 hrs, and the advisory threshold is:
MSL1 = 1695 MW
MSL2 = 1195 MW
MSL3 = 695 MW
The regional demand is forecast to be below the MSL1 threshold for the following period:
From 1100 hrs to 1330 hrs 02/11/2024.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119564 has been updated at 1330 hrs to the following:
[1.] From 1800 hrs 28/10/2024 to 1900 hrs 28/10/2024.
The forecast capacity reserve requirement is 1060 MW.
The minimum capacity reserve available is 934 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 29/10/2024
[1.] From 1730 hrs 29/10/2024 to 1800 hrs 29/10/2024.
The forecast capacity reserve requirement is 955 MW.
The minimum capacity reserve available is 888 MW.
[2.] From 1900 hrs 29/10/2024 to 2000 hrs 29/10/2024.
The forecast capacity reserve requirement is 1041 MW.
The minimum capacity reserve available is 786 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 119535 has been updated at 1230 hrs to the following:
[1.] From 1800 hrs 28/10/2024 to 1900 hrs 28/10/2024.
The forecast capacity reserve requirement is 1059 MW.
The minimum capacity reserve available is 953 MW.
[2.] From 2000 hrs 28/10/2024 to 2130 hrs 28/10/2024.
The forecast capacity reserve requirement is 1053 MW.
The minimum capacity reserve available is 785 MW.
Manager NEM Real Time Operations