Filter by category
Filter by Date
[EventId:202412030655_confirmed] Prices for interval 03-Dec-2024 06:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0705 hrs on 3 December 2024
PRICES ARE NOW CONFIRMED for trading interval 03-Dec-2024 06:55.
In accordance with Market Notice 121396 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412030650_confirmed] Prices for interval 03-Dec-2024 06:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0705 hrs on 3 December 2024
PRICES ARE NOW CONFIRMED for trading interval 03-Dec-2024 06:50.
In accordance with Market Notice 121395 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412030640_confirmed] Prices for interval 03-Dec-2024 06:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0705 hrs on 3 December 2024
PRICES ARE NOW CONFIRMED for trading interval 03-Dec-2024 06:40.
In accordance with Market Notice 121393 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Cancellation of Actual (LOR1) condition in the NSW region - 02/12/2024
Cancellation of Actual (LOR1) condition in the NSW region - 02/12/2024
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.121384 is cancelled at 1920 hrs 02/12/2024.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 02/12/2024
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 02/12/2024
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1700 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs
The capacity reserve requirement is 1370 MW
The minimum capacity reserve available is 1066 MW
Manager NEM Real Time Operations
Cancellation Inter-Regional Transfer limit variation - Murraylink control unavailable (VIC Region)
Cancellation Inter-Regional Transfer limit variation - Murraylink control unavailable (VIC Region)
Refer AEMO Electricity Market Notice 121376
AEMO has been notified that the controls to vary Murraylink output are now available.
Constraint set I-CTRL_ISSUE_ML revoked at 1420 hrs.
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Murraylink control unavailable (VIC Region)
Inter-Regional Transfer limit variation - Murraylink control unavailable (VIC Region)
AEMO has been notified that the controls to vary Murraylink output are unavailable until further notice.
Constraint set I-CTRL_ISSUE_ML invoked from 1350 hrs.
The constraint set contains equations with the following interconnector on the LHS:
V-S-MNSP1
Manager NEM Real Time Operations
[EventId:202412021230_confirmed] Prices for interval 02-Dec-2024 12:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1250 hrs on 2 December 2024
PRICES ARE NOW CONFIRMED for trading interval 02-Dec-2024 12:30.
In accordance with Market Notice 121361 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412021250_confirmed] Prices for interval 02-Dec-2024 12:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1250 hrs on 2 December 2024
PRICES ARE NOW CONFIRMED for trading interval 02-Dec-2024 12:50.
In accordance with Market Notice 121365 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.