Market Notices

118375MARKET INTERVENTION22/09/2024 06:50:12 PM

Direction - SA region 22/09/2024

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 22/09/2024



In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Pelican Point Power Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT at 1850 hrs 22/09/2024
Type of resource: generating unit
Required actions: remain synchronised and follow dispatch targets at 1850 hrs 22/09/2024
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1950 hrs 22/09/2024.

Pelican Point Power Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
118374RESERVE NOTICE22/09/2024 04:20:38 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 23/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118364 has been updated at 1600 hrs to the following:

[1.] From 1830 hrs 23/09/2024 to 2100 hrs 23/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 481 MW.

Manager NEM Real Time Operations
     
118373RESERVE NOTICE22/09/2024 04:15:36 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 23/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 118363 is cancelled at 16:15 hrs 22/09/2024.

Manager NEM Real Time Operations
     
118372MARKET INTERVENTION22/09/2024 03:27:29 PM

Direction - SA region 22/09/2024

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 22/09/2024

Refer to Market Notice 118371


In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN at 1530 hrs 22/09/2024
Type of resource: generating unit
Required actions: remain synchronised and follow dispatch targets at 0700 hrs 23/09/2024
Services provided: Voltage Control
Circumstances necessitating the Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state

Expected duration: 0400 hrs 24/09/2024.

AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
118371MARKET INTERVENTION22/09/2024 03:28:38 PM

Direction - SA region 22/09/2024

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 22/09/2024

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1535 hrs on 22/09/2024.

Intervention pricing does not apply to this AEMO intervention event.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.


Manager NEM Real Time Operations
     
118370MARKET INTERVENTION22/09/2024 03:29:45 PM

Direction - SA region 22/09/2024

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 22/09/2024

Refer to Market Notice 118371


In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN at 1530 hrs 22/09/2024
Type of resource: generating unit
Required actions: synchronise and follow dispatch targets at 0900 hrs 23/09/2024
Services provided: Voltage Control
Circumstances necessitating the Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state

Expected duration: 1530 hrs 23/09/2024.

AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.

Manager NEM Real Time Operations
     
118369MARKET INTERVENTION22/09/2024 02:50:52 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 118365

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0700 hrs 23/09/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1530 hrs 22/09/2024, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
118368MARKET INTERVENTION22/09/2024 03:57:10 PM

Cancellation - AEMO Intervention Event - SA region 17/09/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 17/09/2024

Refer to Market Notice 118309

The AEMO Intervention Event and all associated directions are cancelled from 1600 hrs on 22/09/2024.



Manager NEM Real Time Operations
     
118367MARKET INTERVENTION22/09/2024 03:56:01 PM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer to Market Notice 118357

Direction is cancelled from: 1600 hrs 22/09/2024

Manager NEM Real Time Operations
     
X