Filter by category
Filter by Date
NON-CONFORMANCE Region QLD1 Thursday, 3 October 2024
NON-CONFORMANCE QLD1 Region Thursday, 3 October 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_1
Duration: 03/10/2024 21:00 to 03/10/2024 21:10
Amount: 26 MW
Constraint: NC-Q_MPP_1
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation of the Reclassification of a Non-Credible Contingency Event: Farrell - Reece No. 1 and No. 2 220kV lines in TAS due to bushfire.
AEMO no longer considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has cancelled the reclassification as a credible contingency event.
Region: TAS
Lines: Farrell - Reece No. 1 and No. 2 220kV lines
Cancellation time: 17:40 hrs 03/10/2024
Constraint set(s) invoked: F-T-FARE_N-2
Refer AEMO Electricity Market Notice 118589
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Refer AEMO Electricity Participant Notice 118565
The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 05/10/2024.
The direction update is issued at 1630 hrs 03/10/2024.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer AEMO Electricity Participant Notice 118560
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 05/10/2024.
The direction update is issued at 1630 hrs 03/10/2024.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Farrell - Reece No. 1 and No. 2 220kV lines in TAS due to bushfire.
Reclassification of a Non-Credible Contingency Event: Farrell - Reece No. 1 and No. 2 220kV lines in TAS due to bushfire.
AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: TAS
Lines: Farrell - Reece No. 1 and No. 2 220kV lines
Duration: 03/10/2024 1445 hrs until further notice
Constraint set(s) invoked: F-T-FARE_N-2
Manager NEM Real Time Operations
[EventId:202410031330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 03 October 2024 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 3 October 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 October 2024.
Refer to market notice: 118585
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 3 October 2024.
This is an AEMO autogenerated Market Notice.
Cancellation of Reclassification of a Non-Credible Contingency Event: Glenrowan No1 66kV Bus- Vic region - 18/06/2024.
Cancellation of Reclassification of a Non-Credible Contingency Event: Glenrowan No1 66kV Bus- Vic region - 18/06/2024.
Refer AEMO Electricity Market Notice 117043
Based on advice from the asset owner, AEMO considers the trip of the following element is no longer reasonably possible. Accordingly its classification has reverted to a non-credible contingency event.
Region: Vic
Equipment: Glenrowan No1 66kV Bus
Cancellation time: 1215 hrs 03/10/2024
Constraint set(s) revoked: Nil
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Thursday, 3 October 2024
NON-CONFORMANCE QLD1 Region Thursday, 3 October 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_2
Duration: 03/10/2024 08:35 to 03/10/2024 12:05
Amount: -53 MW
Constraint: NC-Q_MPP_2
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202410031105_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 October 2024 11:05
Issued by Australian Energy Market Operator Ltd at 1105 hrs on 3 October 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 October 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1105 hrs on 3 October 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.