111962RESERVE NOTICE03/12/2023 01:52:33 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 03/12/2023

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Periods:

[1.] From 1830 hrs 03/12/2023 to 1900 hrs 03/12/2023.
The forecast capacity reserve requirement is 1290 MW.
The minimum capacity reserve available is 1287 MW.

[2.] From 2130 hrs 03/12/2023 to 2200 hrs 03/12/2023.
The forecast capacity reserve requirement is 1308 MW.
The minimum capacity reserve available is 1253 MW.


Manager NEM Real Time Operations
111957MARKET INTERVENTION03/12/2023 03:00:12 PM

Direction - SA region 03/12/2023

AEMO ELECTRICITY MARKET NOTICE.

Direction - SA region 03/12/2023

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1505 hrs on 03/12/2023.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
111954MARKET INTERVENTION03/12/2023 11:09:45 AM

Update - Possible intervention to manage power system security in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Possible intervention to manage power system security in SA region

Refer AEMO Electricity Market Notice 111949

The synchronous generating units currently expected to be synchronised in SA from 0000 hrs 04/12/2023 will be inadequate to maintain a secure operating state in SA .

AEMO estimates that, in the absence of sufficient market response by 1500 hrs 03/12/2023, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
111949MARKET INTERVENTION02/12/2023 08:42:33 PM

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units currently expected to be synchronised in SA from 0000 hrs 04/12/2023 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
111947RESERVE NOTICE02/12/2023 07:47:01 PM

Cancellation of Actual (LOR1) condition in the QLD region - 02/12/2023

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 02/12/2023

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.111943 is cancelled at 1945 hrs 02/12/2023.

Manager NEM Real Time Operations
111944RESERVE NOTICE02/12/2023 06:31:37 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 03/12/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 111941 is cancelled at 1825 hrs 02/12/2023.

Manager NEM Real Time Operations
111943RESERVE NOTICE02/12/2023 06:20:45 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 02/12/2023

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 02/12/2023

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1820 hrs.
The Actual LOR1 condition is forecast to exist until 2000 hrs

The capacity reserve requirement is 1299 MW
The minimum capacity reserve available is 1167 MW

Manager NEM Real Time Operations
111941RESERVE NOTICE02/12/2023 04:58:56 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 03/12/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 111938 has been updated at 1700 hrs to the following:

[1.] From 1830 hrs 03/12/2023 to 2000 hrs 03/12/2023.
The forecast capacity reserve requirement is 1295 MW.
The minimum capacity reserve available is 1150 MW.

[2.] From 2130 hrs 03/12/2023 to 2200 hrs 03/12/2023.
The forecast capacity reserve requirement is 1306 MW.
The minimum capacity reserve available is 1278 MW.

Manager NEM Real Time Operations
111940RESERVE NOTICE02/12/2023 04:57:56 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 02/12/2023

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following periods:


[1.] From 1900 hrs 02/12/2023 to 1930 hrs 02/12/2023.
The forecast capacity reserve requirement is 1301 MW.
The minimum capacity reserve available is 1287 MW.



Manager NEM Real Time Operations