Market Notices

112335SETTLEMENTS RESIDUE14/12/2023 03:32:25 PM

[EventId:202312141530_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 14 December 2023 15:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1530 hrs on 14 December 2023

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 14 December 2023.

Refer to market notice: 112322

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1530 hrs on 14 December 2023.

This is an AEMO autogenerated Market Notice.
112333MARKET INTERVENTION14/12/2023 03:29:11 PM

INTENTION TO COMMENCE RERT CONTRACT NEGOTIATIONS

AEMO ELECTRICITY MARKET NOTICE.
Reliability and Emergency Reserve Trader (RERT) Intention to negotiate for additional reserve - NSW1 Region- 14/12/2023

Refer to AEMO Electricity Market Notice no. 112328.
AEMO intends to commence negotiations with RERT Panel members for the provision of additional reserve by issuing requests for tender for the following period of time;
15:30 to 19:30 hrs 14/12/2023
If reserve is required, the period of activation or dispatch will be within this period but may not be for the entire period.
AEMO will issue a further advice if reserve is contracted.


Manager NEM Real Time Operations
112332MARKET INTERVENTION14/12/2023 04:57:58 PM

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 13/12/2023

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 13/12/2023

Refer Market Notice 112261

The AEMO Intervention Event and all associated directions are cancelled from 1700 hrs 14/12/2023

Manager NEM Real Time Operations
112329RESERVE NOTICE14/12/2023 02:56:48 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/12/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 112299 has been updated at 1330 hrs to the following:

[1.] From 1600 hrs 14/12/2023 to 1730 hrs 14/12/2023.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 700 MW.

[2.] From 1800 hrs 14/12/2023 to 2000 hrs 14/12/2023.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 744 MW.

Manager NEM Real Time Operations
112327RESERVE NOTICE14/12/2023 02:51:42 PM

STPASA - Update to the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 19/12/2023

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 112251 has been updated at 1400 hrs 14/12/2023 to the following:

From 1430 hrs to 1530 hrs 19/12/2023.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 854 MW.

AEMO Operations
112326MARKET INTERVENTION14/12/2023 03:28:52 PM

Direction - SA region 14/12/2023

AEMO ELECTRICITY MARKET NOTICE.

Direction - SA region 14/12/2023

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1535 hrs on 14/12/2023.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
112322SETTLEMENTS RESIDUE14/12/2023 02:00:33 PM

[EventId:202312141400_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 14 December 2023 14:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1400 hrs on 14 December 2023

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 14 December 2023.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1400 hrs on 14 December 2023.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
112319SETTLEMENTS RESIDUE14/12/2023 01:30:22 PM

[EventId:202312141330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 14 December 2023 13:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1330 hrs on 14 December 2023

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 14 December 2023.

Refer to market notice: 112315

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 14 December 2023.

This is an AEMO autogenerated Market Notice.
112318MARKET INTERVENTION14/12/2023 02:29:57 PM

Update - Possible intervention to manage power system security in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Possible intervention to manage power system security in SA region

Refer AEMO Electricity Market Notice 112316

The synchronous generating units currently expected to be synchronised in SA from 0800 hrs 15/12/2023 will be inadequate to maintain a secure operating state in SA .

AEMO estimates that, in the absence of sufficient market response by 1530 hrs 14/12/2023, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm