Filter by category
Filter by Date
Reclassification of a Non-Credible Contingency Event: Para-Templers West and Magill-Torrens Island A 275kV lines in SA due to severe weather warning.
Reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.
AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: SA
Lines: Para-Templers West and Magill-Torrens Island A 275kV lines
Duration: 0530 hrs 27 Aug 2024 until further notice
Constraint set(s) invoked: Nil
Manager NEM Real Time Operations
Cancellation of the reclassification of a Non-Credible Contingency Event: Sydney West No.1 330 kV SVC and any single Sydney West 330/132 kV transformer
Cancellation of the reclassification of a Non-Credible Contingency Event: Sydney West No.1 330 kV SVC and any single Sydney West 330/132 kV transformer
Refer AEMO Electricity Market Notice 117212
AEMO considers the simultaneous trip of the following elements no longer reasonably possible. Accordingly its classification has reverted to a non-credible contingency event.
Region: NSW
Elements: Sydney West No.1 330 kV SVC and any single Sydney West 330/132 kV transformer
Cancellation time:: 1400 hrs 26/08/2024
Constraint set(s) invoked: Nil
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 22/08/2024
Cancellation - AEMO Intervention Event - SA region 22/08/2024
Refer to Market Notice 117756
The AEMO Intervention Event and all associated directions are cancelled from 1500 hrs on 26/08/2024.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 117791
Direction is cancelled from: 1500 hrs 26/08/2024
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 117790
Direction is cancelled from: 1500 hrs 26/08/2024
Manager NEM Real Time Operations
Direction - SA region 26/08/2024
Direction - SA region 26/08/2024
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1305 hrs on 26/08/2024.
Intervention pricing does not apply to this AEMO intervention event.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
Manager NEM Real Time Operations
Direction - SA region 26/08/2024
Direction - SA region 26/08/2024
Refer to Market Notice 117810
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN at 1300 hrs 26/08/2024
Type of resource: generating unit
Required actions: remain synchronised and follow dispatch targets at 0100 hrs 27/08/2024
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 28/08/2024.
AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Direction - SA region 26/08/2024
Direction - SA region 26/08/2024
Refer to Market Notice 117810
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN at 1300 hrs 26/08/2024
Type of resource: generating unit
Required actions: to synchronise and follow dispatch targets at 0030 hrs 27/08/2024
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 28/08/2024.
AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Foreseeable AEMO intervention in SA region
Foreseeable AEMO intervention in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0030 hrs 27/08/2024.
The foreseeable circumstance requiring the need for intervention is Voltage.
AEMO estimates that, in the absence of sufficient market response by 1300 hrs 26/08/2024, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations