Market Notices

118404MARKET INTERVENTION23/09/2024 03:28:14 PM

Cancellation - AEMO Intervention Event - SA region 22/09/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 22/09/2024

Refer to Market Notice 118371

The AEMO Intervention Event and all associated directions are cancelled from 1530 hrs on 23/09/2024.



Manager NEM Real Time Operations
118403MARKET INTERVENTION23/09/2024 03:27:03 PM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

Refer to Market Notice 118370

Direction is cancelled from: 1530 hrs 23/09/2024

Manager NEM Real Time Operations
118402MARKET INTERVENTION23/09/2024 03:25:51 PM

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer to Market Notice 118397

Direction is cancelled from: 1530 hrs 23/09/2024

Manager NEM Real Time Operations
118401RESERVE NOTICE23/09/2024 01:26:46 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 23/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118396 has been updated at 1315 hrs to the following:

From 1930 hrs 23/09/2024 to 2100 hrs 23/09/2024.
The forecast capacity reserve requirement is 537 MW.
The minimum capacity reserve available is 443 MW.




Manager NEM Real Time Operations
118400MARKET INTERVENTION23/09/2024 01:13:51 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0000 hrs 24/09/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
118399RESERVE NOTICE23/09/2024 01:02:35 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 24/09/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:

From 1730 hrs 24/09/2024 to 2130 hrs 24/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 382 MW.


Manager NEM Real Time Operations
118398RECLASSIFY CONTINGENCY23/09/2024 12:53:03 PM

Cancellation - Reclassification of a Non-Credible Contingency Event: Eraring Power Station in NSW Region 23/09/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Reclassification of a Non-Credible Contingency Event: Eraring Power Station in NSW Region 23/09/2024

Refer to MN 118393

Based on advice from the asset owner, AEMO no longer considers the simultaneous trip of Eraring Power Station Units 2 and 4 as a credible contingency event.


Therefore AEMO cancels the reclassification as a credible contingency event from 1250 hrs 23/09/2024.

Constraint set N-ERARING_N-2 revoked from 1250 hrs 23/09/2024

Manager NEM Real Time Operations
118397MARKET INTERVENTION23/09/2024 12:46:38 PM

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer AEMO Electricity Participant Notice 118372

The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 1530 hrs 23/09/2024.

The direction update is issued at 1240 hrs 23/09/2024.

Manager NEM Real Time Operations
118396RESERVE NOTICE23/09/2024 12:24:36 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 23/09/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 118395 has been updated at 1220 hrs to the following:

From 2000 hrs 23/09/2024 to 2030 hrs 23/09/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 552 MW.




Manager NEM Real Time Operations