Market Notices

118328MARKET INTERVENTION20/09/2024 08:44:04 AM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 118327

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 1930 hrs 20/09/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1200 hrs 20/09/2024, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
118327MARKET INTERVENTION20/09/2024 07:27:04 AM

Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention in SA region


AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 1630 hrs 20/09/2024.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1430 hrs 20/09/2024, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
118325MARKET INTERVENTION19/09/2024 04:57:32 PM

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer AEMO Electricity Market Notice 118315

The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 0900 hrs 20/09/2024.

The direction update is issued at 1700 hrs 19/09/2024.

Manager NEM Real Time Operations
     
118324MARKET INTERVENTION19/09/2024 04:56:14 PM

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

Refer AEMO Electricity Market Notice 118316

The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 1530 hrs 20/09/2024.

The direction update is issued at 1700 hrs 19/09/2024.

Manager NEM Real Time Operations
     
118322POWER SYSTEM EVENTS19/09/2024 04:16:27 PM

Update - Non-credible contingency event - TAS region - 19/09/2024

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - TAS region - 19/09/2024

Refer AEMO Electricity Market Notice 118321

At 1446 hrs the Gordon - Chapel St No 1 and No 2 220 kV lines were returned to service.

This non-credible contingency event was caused by lightning. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.


Manager NEM Real Time Operations
     
118321POWER SYSTEM EVENTS19/09/2024 03:28:41 PM

Update - Non-credible contingency event - TAS region - 19/09/2024

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - TAS region - 19/09/2024

At 1340 hrs the Gordon - Chapel St No1 and No 2 220 kV lines tripped.

AEMO did not instruct load shedding.

AEMO has advised of approximately 112 MW disconnection of bulk electrical load,
disconnection of generation at Studland Bay Wind generator (71 MW) and 23 MW generation reduction at Gordon Power station.

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations
     
118320POWER SYSTEM EVENTS19/09/2024 01:54:59 PM

Non-credible contingency event - TAS region - 19/09/2024

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - TAS region - 19/09/2024

At 1340 hrs the Gordon - Chapel St No1 and No 2 220 kV lines tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations
     
118316MARKET INTERVENTION18/09/2024 04:56:06 PM

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

Refer AEMO Electricity Market Notice 118306

The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 20/09/2024.

The direction update is issued at 1700 hrs 18/09/2024.

Manager NEM Real Time Operations
     
118315MARKET INTERVENTION18/09/2024 04:54:45 PM

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN

Refer AEMO Electricity Market Notice 118308

The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 20/09/2024.

The direction update is issued at 1700 hrs 18/09/2024.

Manager NEM Real Time Operations
     