Filter by category
Filter by Date
[EventId:202412151300_confirmed] Prices for interval 15-Dec-2024 13:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 15 December 2024
PRICES ARE NOW CONFIRMED for trading interval 15-Dec-2024 13:00.
In accordance with Market Notice 121950 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412151255_confirmed] Prices for interval 15-Dec-2024 12:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 15 December 2024
PRICES ARE NOW CONFIRMED for trading interval 15-Dec-2024 12:55.
In accordance with Market Notice 121948 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412151250_confirmed] Prices for interval 15-Dec-2024 12:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 15 December 2024
PRICES ARE NOW CONFIRMED for trading interval 15-Dec-2024 12:50.
In accordance with Market Notice 121946 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412151245_confirmed] Prices for interval 15-Dec-2024 12:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 15 December 2024
PRICES ARE NOW CONFIRMED for trading interval 15-Dec-2024 12:45.
In accordance with Market Notice 121945 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412151240_confirmed] Prices for interval 15-Dec-2024 12:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 15 December 2024
PRICES ARE NOW CONFIRMED for trading interval 15-Dec-2024 12:40.
In accordance with Market Notice 121944 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412151230_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 15 December 2024 12:30
Issued by Australian Energy Market Operator Ltd at 1230 hrs on 15 December 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 December 2024.
Refer to market notice: 121938
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1230 hrs on 15 December 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202412150820_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 15 December 2024 08:20
Issued by Australian Energy Market Operator Ltd at 0820 hrs on 15 December 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 December 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0820 hrs on 15 December 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Cancellation of a Non-Credible Contingency Event: Kamerunga to Barron Gorge No.7184 132 kV and the Kamerunga to Barron Gorge No.7143 132 kV lines in QLD due to lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: QLD
Lines: Kamerunga to Barron Gorge No.7184 132 kV and the Kamerunga to Barron Gorge No.7143 132 kV lines
Cancellation time: 15/12/2024 04:30
Constraint set(s) invoked: Nil
Refer AEMO Electricity Market Notice 121928
Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Guybal Munjan - Chalumbin 857 275kV line line and Guybal Munjan - Chalumbin 858 275kV line line in QLD1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: QLD1
Lines: Guybal Munjan - Chalumbin 857 275kV line and Guybal Munjan - Chalumbin 858 275kV line
Cancellation time: 15/12/2024 02:49
Constraint set(s) revoked:
Q-RSCH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE
Refer AEMO Electricity Market Notice 121925
Auto-generated on behalf of Manager NEM Real Time Operations