Fast Frequency Response Market - Increase in R1 and L1 FCAS dispatch caps from 11th June 2024
Following review of the operation of the Very Fast FCAS market, from 1300 hrs AEST on Tuesday 11th June AEMO will:
Increase the cap on dispatch of Very Fast Raise (R1) Contingency FCAS from 325 MW to 350 MW
Increase the cap on dispatch of Very Fast Lower (L1) Contingency FCAS from 200 MW to 225 MW
No other changes to the dispatch of Very Fast FCAS or FCAS constraint equation changes will be made on this date.
For information on the Fast Frequency Response (FFR) initiative please visit the website at: https://www.aemo.com.au/initiatives/major-programs/fast-frequency-response
Andrew Groom
AEMO Operations
Network Augmentation Commissioned - QLD Region - 01/06/2024
Network Augmentation Commissioned - QLD Region - 01/06/2024
H90 Tully South 275 kV Switching Station has been cut into the existing Ross - Woree No.8905 275 kV line to form the following circuits:
H13 Ross - H90 Tully South No.8905/1 275 kV line
H90 Tully South - H39 Woree No.8905/2 275 kV line
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 22/05/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 116720 is cancelled at 1200 hrs 20/05/2024.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 22/05/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
1. From 0700 hrs to 0800 hrs 22/05/2024.
The forecast capacity reserve requirement is 1361 MW.
The minimum capacity reserve available is 1355 MW.
2. From 1700 hrs to 1930 hrs 22/05/2024.
The forecast capacity reserve requirement is 1324 MW.
The minimum capacity reserve available is 1305 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 21/05/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 116717 is cancelled at 2030 hrs 19/05/2024.
No LOR2 condition is currently forecast in the STPASA period.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 21/05/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 116701 has been updated at 1800 hrs 19/05/2024 to the following:
[1.] From 1630 hrs 21/05/2024 to 1900 hrs 21/05/2024.
The forecast capacity reserve requirement is 1220 MW.
The minimum capacity reserve available is 1183 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 22/05/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 116698 is cancelled at 1630 hrs 19/05/2024
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 21/05/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 116695 has been updated at 1430 hrs 19/05/2024 to the following:
[1.] From 1630 hrs 21/05/2024 to 2100 hrs 21/05/2024.
The forecast capacity reserve requirement is 1251 MW.
The minimum capacity reserve available is 1177 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 22/05/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
[1.] From 0600 hrs 22/05/2024 to 0730 hrs 22/05/2024.
The forecast capacity reserve requirement is 1354 MW.
The minimum capacity reserve available is 1334 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations