Filter by category
Filter by Date
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 113669 has been updated at 1930 hrs 23/01/2024 to the following:
[1.] From 1430 hrs 25/01/2024 to 2030 hrs 25/01/2024.
The forecast capacity reserve requirement is 1366 MW.
The minimum capacity reserve available is 804 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 113663 has been updated at 1400 hrs 23/01/2024 to the following:
From 1400 hrs to 2100 hrs 25/01/2024.
The forecast capacity reserve requirement is 1316 MW.
The minimum capacity reserve available is 617 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 25/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113664 is cancelled at 1400 hrs 23/01/2024.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 29/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113665 is cancelled at 1200 hrs 23/01/2024.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 29/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1730 hrs to 2030 hrs 29/01/2024.
The forecast capacity reserve requirement is 520 MW.
The minimum capacity reserve available is 495 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 25/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113661 has been updated at 1100 hrs 23/01/2024 to the following:
From 1730 hrs to 2000 hrs 25/01/2024.
The forecast capacity reserve requirement is 738 MW.
The minimum capacity reserve available is 725 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 113658 has been updated at 1100 hrs 23/01/2024 to the following:
From 1430 hrs 25/01/2024 to 2130 hrs 25/01/2024.
The forecast capacity reserve requirement is 1362 MW.
The minimum capacity reserve available is 622 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
Update - Non-credible contingency event - QLD region - 23/01/2024
Update - Non-credible contingency event - QLD region - 23/01/2024
Refer AEMO Electricity Market Notice 113659
At 1122 hrs the H35 Strathmore No2 275 kV bus was returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
Nebo - Strathmore 878 275 kV line to remain out of service.
See Network Outage Scheduler (NOS) for further details.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 25/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1700 hrs to 2030 hrs 25/01/2024.
The forecast capacity reserve requirement is 725 MW.
The minimum capacity reserve available is 417 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations